ANALISIS GANGGUAN HUBUNG SINGKAT DENGAN SOFTWARE ETAP 12.6 (STUDI KASUS GARDU DISTRIBUSI PENYULANG MJP DAN MTM PT.PLN(PERSERO))

ABDULLAH FUAD, . (2021) ANALISIS GANGGUAN HUBUNG SINGKAT DENGAN SOFTWARE ETAP 12.6 (STUDI KASUS GARDU DISTRIBUSI PENYULANG MJP DAN MTM PT.PLN(PERSERO)). Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (259kB)
[img] Text
BAB 2.pdf
Restricted to Registered users only

Download (952kB) | Request a copy
[img] Text
BAB 3.pdf
Restricted to Registered users only

Download (338kB) | Request a copy
[img] Text
BAB 4.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB 5.pdf
Restricted to Registered users only

Download (175kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (175kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (6MB) | Request a copy

Abstract

Penelitian ini bertujuan untuk mengetahui besarnya arus hubung singkat yang terjadi di Gardu Distribusi Penyulang MJP dan MTM Area Menteng Jakarta Pusat dengan software ETAP 12.6. Metode yang digunakan adalah deskriptif kuantitatif. Simulasi hubung singkat dilakukan menggunakan software ETAP 12.6 pada gardu distribusi Penyulang MJP dan MTM Area Menteng. Data yang dibutuhkan untuk simulasi hubung singkat meliputi nilai arus hubung singkat di tiga fasa pada Gardu Induk GL, nilai kapasitas trafo tenaga pada Gardu Induk GL, nilai tegangan nominal pada bus sisi gardu induk dan gardu distribusi, nilai pemutus tenaga outgoing ke arah penyulang, panjang kabel, nilai pemutus tenaga pada gardu distribusi dan besar kapasitas daya yang terpasang pada gardu distribusi. Selanjutnya data yang telah dimasukkan kemudian diolah dan disimulasikan di software ETAP 12.6 dengan menggunakan berbagai skenario mempertimbangkan probabilitas (kemungkinan) terjadinya lokasi di gangguan yang berbeda. Hasil penelitian yang dilakukan diperoleh arus hubung singkat terbesar pada penyulang MJP rincian arus hubung singkat pada gardu S112 sebesar 12,149 kA, gardu P2C sebesar 11,992 kA, gardu P41 sebesar 11,376 kA terjadi pada skenario 6 dan gardu S27 sebesar 9,397 kA terjadi pada skenario 1, penyulang MTM rincian arus hubung singkat pada gardu K143 sebesar 9,898 kA, gardu S51 sebesar 9,644 kA terjadi pada skenario 30, gardu K179 sebesar 9,258 kA terjadi pada skenario 31 dan gardu S4E sebesar 9,295 kA terjadi pada skenario 28. Berdasarkan IEC 62271 tentang batas arus hubung singkat dengan tegangan pengenal 24 kV maka dapat disimpulkan bahwa arus hubung singkat pada penyulang MJP dan MTM tidak melebihi batas arus hubung singkat yang ditetapkan sebesar 16 kA. This study aims to see all the currents that occured in the MJP and MTM Feeder Distribution Substation in the Menteng Area of Central Jakarta with the ETAP 12.6 software. The method used is descriptive quantitative. A short circuit simulation was carried out using ETAP 12.6 software at the MJP and MTM area feeder distribution substations. The data required for the short circuit simulation includes the value of short circuit current in three phases at the GL substation, the value of the power transformer capacity at the GL substation, the nominal voltage value on the bus side of the substation and distribution substation, the value of the outgoing power breaker towards the feeder, length cable, rated breaker at distribution substation and large capacity of power installed at distribution substation. Furthermore, the data that has been entered are then processed and simulated in the ETAP 12.6 software by using various scenarios of probability (likelihood) scenarios for the occurrence of locations in different disturbances. The results of the research obtained the largest short circuit current in the MJP feeder, the details of the short circuit current at the S112 substation are 12,149 kA, the P2C substation is 11,992 kA, the P41 substation is 11,376 kA occurs in scenario 6 and the S27 substation is 9,397 kA occurs in scenario 1, the MTM feeder details of short circuit current at K143 substation of 9,898 kA, S51 substation of 9,644 kA occurs in scenario 30, substation K179 of 9,258 kA occurs in scenario 31 and substation S4E of 9,295 kA occurs in scenario 28. Based on IEC 62271 regarding short circuit current limit. for the rated voltage of 24 kV it can be neglected that the short currents in the MJP and MTM feeders do not exceed the short-circuit limit set at 16 kA.

Item Type: Thesis (Sarjana)
Additional Information: 1). Dr.Daryanto M.T ; 2). Imam Arif Rahardjo M.T
Subjects: Teknologi dan Ilmu Terapan > Teknik Elektronika
Divisions: FT > S1 Pendidikan Teknik Elektro
Depositing User: Users 9211 not found.