IDENTIFIKASI BAHAYA DAN PENILAIAN RISIKO PADA PROSES PEKERJAAN PEMASANGAN SANDWICH PANEL

FIRA NABILA, . (2021) IDENTIFIKASI BAHAYA DAN PENILAIAN RISIKO PADA PROSES PEKERJAAN PEMASANGAN SANDWICH PANEL. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (1MB)
[img] Text
BAB I.pdf

Download (511kB)
[img] Text
BAB II.pdf
Restricted to Registered users only

Download (673kB) | Request a copy
[img] Text
BAB III.pdf
Restricted to Registered users only

Download (418kB) | Request a copy
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (121kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (216kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

*ABSTRAK* Penelitian ini bertujuan untuk mengetahui bahaya dan risiko dalam proses pekerjaan pemasangan sandwich panel di stasiun LRT Dukuh Atas, dengan menggunakan lembar Job Safety Analysis (JSA) dalam mengidentifikasi bahaya dan risiko kemudian menganalisis tiap risiko dengan mengacu pada standar AS/NZS 2004 tabel W.T Fine J. Data penelitian diperoleh dari observasi, wawancara, FGD dan studi dokumentasi. Pengumpulan data dilakukan dengan observasi lapangan dengan bantuan lembar JSA (Job Safety Analysis) selama satu bulan untuk mengetahui tahapan kerja, bahaya, risiko dan pengendalian yang ada dalam proses pekerjaan pemasangan sandwich panel. Pengumpulan data lainnya dilakukan dengan wawancara bersama HSE LRT Dukuh Atas dan pengawas khusus pekerjaan pemasangan sandwich panel. Wawancara dilakukan sebanyak tiga kali pertemuan dengan tujuan mengetahui tahapan kerja secara rinci, bahaya, risiko dan pengendalian yang sudah ada di lapangan. Tahapan selanjutnya yaitu melakukan Focus Group Discussion sebanyak dua pertemuan untuk menganalisis risiko dengan memberikan nilai exposure, probability dan consequence pada tiap risiko yang sudah teridentifikasi sebelumnya. Data kemudian dievaluasi dengan mengurutkan risiko paling parah hingga risiko yang paling bisa diterima untuk mendapatkan rekomendasi pengendalian yang tepat. Hasil penelitian menunjukkan, dalam proses pemasangan sandwich panel terdapat 6 bahaya yang teridentifikasi, diantaranya adalah bahaya mekanis, fisik, biologis, listrik, ergonomis dan biologi. Risiko yang teridentifikasi dalam proses pekerjaan pemasangan sandwich panel sebanyak 21 risiko. Dari 21 risiko, sebanyak 7 risiko dengan tingkat Very High, 5 risiko dengan tingkat priority 1, 6 risiko dengan tingkat substansial, 3 risiko dengan tingkat priority 3 dan 0 risiko dengan tingkat acceptable. Rekomendasi pengendalian dapat berupa pengendalian administratif, pengendalian teknis dan APD. Kata Kunci: Identifikasi Bahaya, Penilaian Risiko, Sandwich Panel *ABSTRACT* This study aims to determine the hazards and risks in the work process of installing sandwich panels at the Dukuh Atas LRT station, using the Job Safety Analysis (JSA) sheet in identifying hazards and risks and then analyzing each risk by referring to the AS/NZS 2004 standard WT Fine J table. The research data were obtained from observations, interviews, FGDs and documentation studies. Data collection was carried out by field observations with the help of JSA (Job Safety Analysis) sheets to determine the work stages, hazards, risks and controls in the sandwich panel installation work process. Other data collection was carried out by interviewing the HSE LRT Dukuh Atas and the special supervisor for the sandwich panel installation work. The next stage is to conduct a Focus Group Discussion in two meetings to analyze risk by providing exposure, probability and consequence values for each previously identified risk. The data is then evaluated to obtain appropriate control recommendations. The results showed that in the process of installing sandwich panels there were 6 identified hazards, including mechanical, physical, biological, electrical, ergonomic and biological hazards. There are 21 risks identified in the sandwich panel installation process. Of the 21 risks, there are 7 risks with a Very High level, 5 risks with a priority level of 1, 6 risks with a substantial level and 3 risks with a priority level 3. Control recommendations can be in the form of administrative control, technical control and APD. Keywords: Hazard Identification, Risk Assessment, Sandwich Panel

Item Type: Thesis (Sarjana)
Additional Information: 1) Drs. Prihantono, ST., M.Eng 2) Anisah, MT.
Subjects: Teknologi dan Ilmu Terapan > Teknik Sipil
Teknologi dan Ilmu Terapan > Teknik Jembatan
Divisions: FT > S1 Pendidikan Teknik Bangunan
Depositing User: Users 12416 not found.
Date Deposited: 02 Sep 2021 21:39
Last Modified: 02 Sep 2021 21:39
URI: http://repository.unj.ac.id/id/eprint/19242

Actions (login required)

View Item View Item