PERENCANAAN BAK PENAMPUNG DAN POMPA SEBAGAI ALTERNATIF PENANGANAN MASALAH GENANGAN AIR HUJAN PADA DRAINASE JALAN (Studi Kasus: Jalan Nusa Indah Raya, Kelurahan Malaka Jaya, Kecamatan Duren Sawit, Jakarta Timur)

ANNISA DEWANTI PUTRI, . (2015) PERENCANAAN BAK PENAMPUNG DAN POMPA SEBAGAI ALTERNATIF PENANGANAN MASALAH GENANGAN AIR HUJAN PADA DRAINASE JALAN (Studi Kasus: Jalan Nusa Indah Raya, Kelurahan Malaka Jaya, Kecamatan Duren Sawit, Jakarta Timur). Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
SKRIPSI.pdf
Restricted to Registered users only

Download (0B)

Abstract

Penelitian ini bertujuan untuk melakukan perencanaan bak penampung berikut pompa terhadap saluran drainase. Perencanaan ini diupayakan sebagai alternatif dalam permasalahan genangan sedalam hampir 60 cm akibat hujan yang kerap kali terjadi di Jalan Nusa Indah Raya sehingga tidak menghambat arus lalu lintas dan merugikan kegiatan masyarakat sekitar. Perencanaan dilakukan dengan cara melakukan observasi lapangan, studi kepustakaan, serta dengan mengikuti pedoman terkait perencanaan drainase dari Departemen Pekerjaan Umum dan Standar Nasional Indonesia (SNI). Analisa distribusi curah hujan dilakukan dengan metode Normal, Log Normal, Log Pearson III, dan Normal. Sementara, berdasarkan uji dispersi dan uji chi kuadrat dengan taraf nyata pengujian (α) 0,05 maka, hasil curah hujan yang memenuhi syarat adalah distriusi Log Pearson III dengan nilai curah hujan (Xtr) sebesar 685,09 mm. Dengan rumus Van Breen, didapat nilai Intensitas hujan sebesar 154,15 mm/jam. Sesuai dengan luas tangkapan dari drainase jalan raya, maka perhitungan debit banjir (Qr) menggunakan metode rasional dengan periode ulang 5 tahunan didapatkan sebesar 0,1856 m³/dtk. Kapasitas daya tampung (Qs) dari saluran dihitung dan didapatkan yaitu sebesar 0,2748 m3 /dtk sehingga Qr > Qs, sehingga saluran tidak perlu di redemensi. Namun, genangan tetap terjadi akibat kondisi topografi yang relatif rendah. Sementara, untuk alternatif mengatasi masalah jalan yang relatif rendah sehingga terjadi genangan, maka perencanaan menggunakan pompa dapat dilakukan dengan bak penampung dengan volume sebagai penampung sementaranya sebelum dialirkan menuju kali PHB Nusa Indah. Didapatkan perencanaan bak penampung dengan pasangan bata sebesar 26 x 5 x 4 meter. Untuk pompa rencana yang didapatkan yaitu dengan satu unit pompa jenis sentrifugal dengan kapasitas sebesar 150 liter/detik. *This study aims to do the following design of the storage tank and pump for the drainage. Planning is pursued as an alternative to the problem of an approximate of 60 cm high of puddle due to the rain that often occur in Jalan Nusa Indah Raya, so as not to impede the flow of traffic and activities around this region. The design are based on observation, literature study, and by following the relevant guidelines of drainage design from the Department of Public Works and the Indonesian National Standard (SNI). Analysis of rainfall distribution is done by the method of Normal, Normal Log, Gumbel, and Log Pearson III. While, based on the dispersion test and chi squared test with significance level (α) 0.05 then, the result of precipitation that is eligible cames from the Log Pearson III with the number of rainfall (Xtr) of 685,09 mm. Using the Van Breen method, the rain intensity value was obtained by 154,15 mm/hour. According to the catchment area of the drainage of this road, the calculation of flood discharge (Qr) using rational method with 5-year return period was obtained by 0,1856 m³/sec. Meanwhile, the Capacity (Qs) of the channel is calculated as 0,2748 m³/sec. This means that Qr > Qs, so that the channel dimension does not need to be changed. Meanwhile, the rain puddle problem still occur because of the low surface of the location. While for an alternative way to solve the puddle or flood problem caused by a lower land surface of this road, the design using the pump and storage tank can be done. The storage tank with a volume as temporary placeholders before it flowed into the river of Nusa Indah. The dimension result for the storage tank is 26 x 5 x 4 meters. The materials that is used is masonry. For the pump design, it is chosen with one unit of centrifugal pump with a capacity of 150 liters / sec.

Item Type: Thesis (Sarjana)
Additional Information: 1). Drs. Arris Maulana, MT ; 2). Dra. Daryati, MT
Subjects: Teknologi dan Ilmu Terapan > Konstruksi Bangunan
Divisions: FT > S1 Pendidikan Teknik Bangunan
Depositing User: Users 8922 not found.
Date Deposited: 21 Apr 2022 03:28
Last Modified: 21 Apr 2022 03:28
URI: http://repository.unj.ac.id/id/eprint/26956

Actions (login required)

View Item View Item