ADIRA HERESTU T.P, . (2017) IDENTIFIKASI RISIKO PEMBENGKAKAN BIAYA MATERIAL PROYEK BANGUNAN TINGKAT TINGGI DI JAKARTA. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
01. COVER.pdf Download (29kB) |
|
Text
02. HALAMAN PERSETUJUAN.pdf Download (274kB) |
|
Text
03. HALAMAN PENGESAHAN.pdf Download (365kB) |
|
Text
04. HALAMAN PERNYATAAN.pdf Download (396kB) |
|
Text
05. KATA PENGANTAR.pdf Download (141kB) |
|
Text
06-1. ABSTRAK.pdf Download (85kB) |
|
Text
06-2. ABSTRACT.pdf Download (85kB) |
|
Text
07. DAFTAR ISI.pdf Download (89kB) |
|
Text
08. DAFTAR TABEL.pdf Download (85kB) |
|
Text
09. DAFTAR GAMBAR.pdf Download (83kB) |
|
Text
10. DAFTAR LAMPIRAN.pdf Download (83kB) |
|
Text
11. DAFTAR PUSTAKA.pdf Download (172kB) |
|
Text
12. RIWAYAT HIDUP.pdf Download (104kB) |
Abstract
Penelitian ini bertujuan untuk mengidentifikasi serta menentukan risiko yang paling dominan yang menyebabkan pembengkakan biaya material pada proyek bangunan tingkat tinggi di Jakarta. Penelitian ini dilakukan di sepuluh proyek bangunan tingkat tinggi yang ada di Jakarta. Metode penelitian ini menggunakan metode survey dengan menyebarkan kuesioner dan melakukan wawancara kepada beberapa responden. Dari hasil yang didapat, kemudian dilakukan analisis risiko kualitatif sesuai dengan Project Management Body of Knowledge (PMBOK) Guide 2013, untuk mendapatkan nilai, level dan peringkat risikonya. Sehingga dapat diketahui risiko yang dominan. Berdasarkan hasil penelitian, dari hasil identifikasi risiko pada sepuluh proyek yang ada di Jakarta didapat dua risiko dominan yang menyebabkan terjadinya pembengkakan biaya material proyek. Pada peringkat pertama adalah karena kesalahan dalam mengembangkan dan menerapkan metode standar untuk melakukan suatu pekerjaan, dengan nilai 0.19 dan kurang tepatnya dalam mempredikasi situasi pasar, dengan nilai 0.18, keduanya termasuk kedalam risiko tinggi. This research aims to identify and determine the most dominant risk which cause swelling to the material cost of high rise building project in Jakarta. This research was conducted in ten high rise building projects in Jakarta. This research method was using survey method, by distributing questionnaires and interviewing some respondents. From the obtained results, then conduct a qualitative risk analysis due to the Project Management Body of Knowledge (PMBOK) Guide 2013, to obtain the risk scores, level and rank. So the dominant risks can be known. Based on the research results, from the identification results of the ten projects in Jakarta, obtained two dominant risks that cause the swelling to the cost of the material project. On the first rank is due to errors in evolving and applying the standard methods for performing the project job, with 0.19 as its score, then less precise in predicting the market situation as the second rank with the score 0.18, and both of those risks belong to the high risk.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1) Anisah, MT 2) Winoto Hadi, MT |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil |
Divisions: | FT > S1 Pendidikan Teknik Bangunan |
Depositing User: | sawung yudo |
Date Deposited: | 21 Apr 2022 06:51 |
Last Modified: | 21 Apr 2022 06:51 |
URI: | http://repository.unj.ac.id/id/eprint/27424 |
Actions (login required)
View Item |