ANALISIS SISTEM PEMBEBANAN INSTALASI LISTRIK 3 PHASE DI GEDUNG INSTITUTE CARREFOUR INDONESIA JUANDA - BEKASI

ISNADI HANIFAH, . (2015) ANALISIS SISTEM PEMBEBANAN INSTALASI LISTRIK 3 PHASE DI GEDUNG INSTITUTE CARREFOUR INDONESIA JUANDA - BEKASI. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
ISNADI HANIFAH - 5115107231.pdf

Download (3MB)

Abstract

Penelitian ini bertujuan adalah untuk mengetahui kondisi instalasi listrik di gedung ICI sudah sesuai Persyaratan Umum Instalasi Listrik (PUIL 2000) dan untuk mengetahui sistem pembebanan instalasi listrik di Gedung Institute Carrefour Indonesia (ICI), sehingga dapat memperbaiki sistem kehandalan instalasi berdasarkan Persyaratan Umum Instalasi Listrik (PUIL Tahun 2000). Penelitian ini dilakukan di Gedung Institute Carrefour Indonesia (ICI) pada bulan Juni 2015. Dalam penelitian ini menggunakan metode studi kasus dengan melakukan analisa beban dan ketidakseimbangan beban dan merancang pembagian beban untuk memperbaiki instalasi yang ada di Gedung Institute Carrefour Indonesia (ICI) berdasarkan data pengukuran agar terjadi pemakaian beban yang mendekati keseimbangan. Hasil penelitian di Gedung Institute Carrefour Indonesia adalah hasil dimana sebuah sistem pekerjaan yang tergesa-gesa oleh desakan pihak owner yang menginginkan sebuah gedung selesai dengan cepat. Terjadi ketidakseimbangan antar fasa di gedung Institute Carrefour Indonesia (ICI) ini, dimana sebelum dilakukannya perbaikan prosentase ketidakseimbangannya adalah 21,51% dan setelah dilakukan perbaikan prosentase ketidakseimbangannya menurun menjadi 12,66%.Penelitian ini juga memberikan solusi dalam hal pemerataan pembagian beban dan solusi memperbaiki kualitas listrik di gedung ini seperti memberikan solusi dalam pemecahan kelompok beban yang masih menyatukan antara beban tenaga dan beban penerangan. Walaupun sudah dilaksanakannya perbaikan dan juga sudah mengurangi sedikit prosentase ketidakseimbangan, namun penelitian ini bisa dilanjutkan dengan penelitian lanjutan. *The aim of this study was to determine the condition of electrical installations in buildings is appropriate ICI General Requirements Electrical Installation (PUIL 2000) and to determine the loading system electrical installation in the building Carrefour Indonesia Institute (ICI), so as to improve the reliability of system installation by General Requirements Electrical Installation (PUIL 2000). This research was conducted in Carrefour Indonesia Building Institute (ICI) in June 2015. In this research using the case study method to analyze loads and load imbalance and designing of burden-sharing to improve existing installations in Carrefour Indonesia Building Institute (ICI) is based on measurement data that occur close to balance load usage. Results of research in Carrefour Indonesia Building Institute is the result of a system where a hasty work by urging the owner who wants a building completed quickly. There is an imbalance between phases in the building of Carrefour Indonesia Institute (ICI), where prior to repair load imbalance percentage is 21.51% and after repair load imbalance percentage decreased to 12.66% . This study also provide a solutions in terms of equitable burden sharing and solutions improve the quality of the electricity in the building, such as providing solutions in solving groups that still unites the load between the load power and lighting loads. Although it is the implementation of improvements and also has reduced slightly the percentage of imbalance, but this study could proceed with further research

Item Type: Thesis (Sarjana)
Additional Information: 1). Dr. Suyitno, M.Pd ; 2). Drs. Irzan Zakir, M.Pd
Subjects: Teknologi dan Ilmu Terapan > Teknik Elektronika
Divisions: FT > S1 Pendidikan Teknik Elektro
Depositing User: Users 8922 not found.
Date Deposited: 26 Apr 2022 05:42
Last Modified: 26 Apr 2022 05:42
URI: http://repository.unj.ac.id/id/eprint/27545

Actions (login required)

View Item View Item