PERHITUNGAN PRESSURE DROP SISTEM PLAMBING AIR BERSIH DENGAN MENGGUNAKAN MEDIA MICROSOFT EXCEL SEBAGAI DATABASE PADA GEDUNG “X” JAKARTA SELATAN

SEPTYANTO EKO NURCAHYO, . (2017) PERHITUNGAN PRESSURE DROP SISTEM PLAMBING AIR BERSIH DENGAN MENGGUNAKAN MEDIA MICROSOFT EXCEL SEBAGAI DATABASE PADA GEDUNG “X” JAKARTA SELATAN. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
Skripsi Full _Septyanto Eko Nurcahyo - 5315127352_.pdf

Download (7MB)

Abstract

Penelitian ini bertujuan untuk mengetahui sistem perpipaan air bersih dari sumber ke ground tank menuju ke roof tank beserta perlengkapan yang dibutuhkan. Penelitian ini juga bertujuan menghitung kebutuhan air bersih, mendapatkan perhitungan pressure drop sistem plambing dengan menggunakan media microsoft excel sebagai database dan menghitung kebutuhan head pompa serta daya pompa gedung “X” dengan jumlah 35 lantai. Metode yang digunakan dalam penelitian ini yaitu observasi lapangan, mempelajari dokumen atau arsip yang berhubungan sistem plambing air bersih di gedung “X” Jakarta Selatan. Dan metode komputasi dengan software microsoft excel untuk membuat rumus perhitungan sebagai database. Hasil perhitungan kebutuhan air bersih total gedung “X” Jakarta Selatan adalah 205 m3 /hari. Pada gedung “X” terdapat 2 buah tangki atap yaitu 1 buah di lantai refuge dengan kapasitas tangki 30 m3 untuk distribusi ke toilet lantai 17 sampai dengan toilet lantai basement 2 dan 1 buah di lantai atap dengan kapasitas 15 m3 untuk distribusi ke toilet lantai 31 sampai dengan toilet lantai18. Sedangkan untuk toilet dilantai 34, 33 & 32 distribusi air menggunakan pompa booster. Hasil pressure drop tertinggi pada toilet tipikal lantai 3 s/d lantai 20 yaitu 41,41 meter. Hasil pressure drop terendah pada toilet excecutive lantai 2 s/d lantai 34 yaitu 1,95 meter. Untuk head pompa transfer dari ground tank ke lantai refuge adalah 102,28 m dan daya pompa 19,97 kW. Head pompa transfer dari lantai refuge menuju roof tank adalah 61,07 m dan daya pompa 6,03 kW. Head pompa booster adalah 3,18 m dan daya pompa 0,27 kW. This research aims to determine the piping system of clean water from the source to ground tank towards roof tank including equipments that are required. This research is also aiming to calculate clean water needs, calculation of pressure drop on plumbing system using microsoft excel media as a database and calculation the head pump requirements and pump power of building "X" with 35 floors. The method used in this research is field observation, studying documents ir archives related to the clean water plumbing system in building x south jakarta and computation method using microsoft excel to make equations as database. The result of calculation of clean water plumbing system in building x south jakarta is 205 m 3 /day. In building x there are 2 roof tanks, 1 on refuge floor with capacity of 30 m 3 to distribute water to 17th floor to the basement 2, and 1 tank on the roof floor with capacity of 15 m 3 to distribute water to 31st to 18th floor. Meanwhile toilets on the 34th, 33rd and 32nd floors get water provided by booster pump. The highest result of pressure drop on the typical toilets on 2nd to 20th is 32.54 m. The lowest result of pressure drop on the excecutive toilets on the 2nd to 34th floors is 0.76 m. For the head pump, transfer from ground tank to refuge floor is 102.28 m and pump power 19,97 kW. Head pump transfer from refuge floor to roof tank is 61,07 m and pump power 6,03 kW. Booster head pump is 3,18 m and pump power is 0.27 kW.

Item Type: Thesis (Sarjana)
Additional Information: 1) Wardoyo, S.T., M.T 2) Pratomo Setyadi, S.T., M.T
Subjects: Teknologi dan Ilmu Terapan > Teknik Mesin, Mekanika Teknik
Divisions: FT > S1 Pendidikan Teknik Mesin
Depositing User: sawung yudo
Date Deposited: 26 Apr 2022 02:23
Last Modified: 26 Apr 2022 02:23
URI: http://repository.unj.ac.id/id/eprint/28040