HUBUNGAN PRAKTIK KERJA INDUSTRI DENGAN KESIAPAN KERJA SISWA SMK NEGERI 1 CIBINONG KELAS XII KOMPETENSI KEAHLIAN TEKNIK GAMBAR BANGUNAN

YUDIANA PRATAMA, . (2018) HUBUNGAN PRAKTIK KERJA INDUSTRI DENGAN KESIAPAN KERJA SISWA SMK NEGERI 1 CIBINONG KELAS XII KOMPETENSI KEAHLIAN TEKNIK GAMBAR BANGUNAN. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
SKRIPSI 15 FEBRUARI 2018 JADI.pdf

Download (4MB)

Abstract

Tujuan Penelitian untuk mengetahui hubungan antara praktik kerja industri terhadap kesiapan kerja siswa di Kompetensi Keahlian Teknik Gambar Bangunan SMK Negeri 1 Cibinong, yang beralamat di Jalan Karadenan No.7, Cibinong Bogor, Jawa Barat16913. Penelitian ini dilaksanakan selama 4 bulan sejak Oktober 2017 sampai dengan Januari 2018 yang teridir dari tiga tahap yaitu tahap persiapan, tahap pelaksanaan, dan tahap pengolahan data. Jenis penelitian yang digunakan adalah kuantitatif asosiatif. Metode penelitian adalah metode survei dengan pendekatan korelasi. Populasi adalah siswa SMK Negeri 1 Cibinong Kompetensi Keahlian Teknik Gambar Bangunan yaitu sebanyak 212 orang siswa. Sampel menggunakan cluster random sampling, yang akan dilakukan pada siswa kelas XII sebanyak 69 orang siswa, yaitu kelas XII TGB 1,yang berjumlah 35 siswa, kelas XII TGB 2, yang berjumlah 34 siswa. Hasil penelitian adalah nilai koefisien korelasi sebesar 0,41 dengan kategori sedang, dan terdapat hubungan yang signifikan dari praktik kerja industri terhadap kesiapan kerja siswa di SMK Negeri 1 Cibinong Kompetensi Keahlian Teknik Gambar Bangunan. Penelitian ini dibuktikan dengan thitung lebih besar dari ttabel sebesar 3,644 > 1,66 para taraf signifikan 5% maka H0 ditolak dan H1 diterima. The purpose of research to know the relationship between work practices against best work inside the box making is a sunset industry readiness to administer the program child in that school in competency skills gambar bangunan explained that well as those from vocational 1 cibinong , lived at jl karadenan no.7 , cibinong bogor jawa barat he said , jawa barat16913 .This research has been conducted for 4 months have passed since the october 2017 to january 2018 which consists of three stages of preparation stage, implementation phase, and processing phase. The kind of research that is used is identification quantitative associative. Research methodology is a method of surveying the with the approach at least a high school .Percent of the population was students graduate well as those from vocational 1 cibinong competency of building explained that with the rest of teachers 212 of people students .A small sample of using clusters of random sampling , who will be conducted in student of class xii as many as 69 of people students , pt pgn promised to supply of class XII TGB 1 , that the others were twice 35 students , of class XII TGB 2 , that the others were twice 34 students. The results of the study is the value of a correlation coefficient 0f 0,41 with medium category, and there are a significant realation form practices industrial work against readiness work students in state vocational schools 1 Cibinong skills technique picture building. Research is proven by thitung greater than ttable of 3,644>1,66 the level of significant so H0 5% were rejected and H1 accepted.

Item Type: Thesis (Sarjana)
Additional Information: 1). Dra. Daryati, MT ; 2). Dr. Riyan Arthur, M.Pd
Subjects: Ilmu Sosial > Industri, Buruh, Produksi
Divisions: FT > S1 Pendidikan Teknik Bangunan
Depositing User: Users 14629 not found.
Date Deposited: 14 Jun 2022 03:21
Last Modified: 14 Jun 2022 03:21
URI: http://repository.unj.ac.id/id/eprint/30252

Actions (login required)

View Item View Item