STUDI POTENSI ENERGI ANGIN SEBAGAI PEMBANGKIT LISTRIK TENAGA BAYU (PLTB) DI DAERAH PESISIR LAUT KABUPATEN KARAWANG PROVINSI JAWA BARAT UNTUK SUMBER ENERGI LISTRIK

RADEN AYU MUTHIA RAMADHINI PUTRI, . (2023) STUDI POTENSI ENERGI ANGIN SEBAGAI PEMBANGKIT LISTRIK TENAGA BAYU (PLTB) DI DAERAH PESISIR LAUT KABUPATEN KARAWANG PROVINSI JAWA BARAT UNTUK SUMBER ENERGI LISTRIK. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (648kB)
[img] Text
BAB 1.pdf

Download (418kB)
[img] Text
BAB 2.pdf
Restricted to Registered users only

Download (893kB) | Request a copy
[img] Text
BAB 3.pdf
Restricted to Registered users only

Download (365kB) | Request a copy
[img] Text
BAB 4.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB 5.pdf
Restricted to Registered users only

Download (36kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (157kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

Salah satu energi terbarukan yang berpotensi di Indonesia adalah energi angin. Mengingat Indonesia merupakan negara yang terletak pada garis khatulistiwa, dengan keadaan 70% wilayah perairan menyebabkan Indonesia memiliki potensi energi angin yang besar. Namun demikian, Indonesia masih sangat minim dalam implementasi energi baru terbarukan. Salah satu penyebab hal tersebut adalah kurangnya kajian tentang potensi energi angin. Penelitian ini bertujuan untuk melihat potensi pemanfaatan energi angin sebagai sumber energi untuk pembangkit listrik di daerah pesisir Kabupaten Karawang dilokasi terpilih. Metode penelitian yang digunakan adalah metode deskriptif dengan pendekatan kuantitatif. Analisis potensi energi angin menggunakan data sekunder kecepatan angin di daerah pesisir Kabupaten Karawang dilokasi terpilih tahun 2017-2021 yang tersedia di National Aeronautics and Space Administration (NASA). Kondisi energi angin yang ada di daerah pesisir Kabupaten Karawang berada di kelas 4 dengan kecepatan rata-rata sebesar 3,8 m/s dengan rapat daya angin sebesar 90,54 Watt/m2 pada elevasi pengukuran 50 m. Setelah melakukan analisis data kecepatan angin tahun 2017-2021 di daerah pesisir Kabupaten Karawang dengan persamaan distribusi weibull, maka didapat parameter bentuk (k) sebesar 2.9576 dan parameter skala (c) sebesar 4.2576. Dengan melakukan analisis capacity factor terhadap 5 jenis turbin angin yang berbeda untuk melihat potensi pemanfaatan energi angin untuk pembangkitan energi listrik maka dipilih turbin Tuge 10 kW dengan keluaran energi sebesar 67.332 kWh/tahun dan capacity factor sebesar 76,8%. Turbin Tuge dengan kapasistas 10 kW membutuhkan biaya sebesar Rp 217.840.000 dengan cost of energy sebesar Rp 280,08 per kWh. One of the potential renewable energies in Indonesia is wind energy. Considering that Indonesia is a country located on the equator, with 70% of the water area, Indonesia has a large wind energy potential. However, Indonesia is still very minimal in the implementation of new renewable energy. One reason for this is the lack of studies on the potential of wind energy. This study aims to see the potential utilization of wind energy as a source of energy for power generation in the coastal areas of Karawang Regency in selected locations. The research method used is descriptive method with a quantitative approach. Analysis of wind energy potential uses secondary wind speed data in the coastal areas of Karawang Regency in selected locations for 2017-2021 available at the National Aeronautics and Space Administration (NASA). The condition of wind energy in the coastal areas of Karawang Regency is in class 4 with an average speed of 3.8 m/s with a wind power density of 90.54 Watt/m2 at a measurement elevation of 50 m. After analyzing wind speed data for 2017-2021 in the coastal area of Karawang Regency with the weibull distribution equation, the shape parameter (k) is 2.9576 and the scale parameter (c) is 4.2576. By carrying out a capacity factor analysis of 5 different types of wind turbines to see the potential utilization of wind energy for generating electricity, a 10 kW Tuge turbine was selected with an energy output of 67,332 kWh/year and a capacity factor of 76.8%. A Tuge turbine with a capacity of 10 kW costs IDR 217,840,000 with a cost of energy of IDR 280.08 per kWh.

Item Type: Thesis (Sarjana)
Additional Information: 1). Prof. Dr. Suyitno Muslim, M.Pd. ; 2). Ir. Drs. Parjiman, M.T.
Subjects: Teknologi dan Ilmu Terapan > Teknik Energi > Energi Listrik
Divisions: FT > S1 Pendidikan Teknik Elektro
Depositing User: Users 16810 not found.
Date Deposited: 20 Feb 2023 05:07
Last Modified: 20 Feb 2023 05:07
URI: http://repository.unj.ac.id/id/eprint/36913

Actions (login required)

View Item View Item