SITI NURUL AFINA, . (2023) ANALISA KELAIKAN INSTALASI LISTRIK RUMAH TINGGAL BERDASARKAN STANDAR PUIL 2011 (STUDI KASUS PADA PERUMAHAN RAWAN BANJIR SAWANGAN ASRI DAN SAWANGAN PERMAI, KECAMATAN SAWANGAN, KOTA DEPOK, JAWA BARAT). Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
COVER.pdf Download (1MB) |
|
Text
BAB 1.pdf Download (190kB) |
|
Text
BAB 2.pdf Restricted to Registered users only Download (624kB) | Request a copy |
|
Text
BAB 3.pdf Restricted to Registered users only Download (339kB) | Request a copy |
|
Text
BAB 4.pdf Restricted to Registered users only Download (484kB) | Request a copy |
|
Text
BAB 5.pdf Restricted to Registered users only Download (177kB) | Request a copy |
|
Text
DAFTAR PUSTAKA.pdf Download (183kB) |
|
Text
Lampiran.pdf Restricted to Registered users only Download (2MB) | Request a copy |
Abstract
Kebutuhan akan energi listrik merupakan kebutuhan jangka panjang yang perlu sekali upaya perawatan, dan pemeriksaan secara berkala agar terjaganya keamanan pada pengguna listrik. Tujuan dari penelitian ini adalah untuk menganalisis standar kelaikan perlengkapan instalasi listrik rumah tinggal sesuai dengan standar PUIL 2011 pada perumahan rawan banjir sawangan asri dan sawangan permai, Kota Depok, Jawa Barat. Penelitian ini menggunakan metode deskriptif kuantitatif yang bertujuan untuk membandingkan standar pemasangan perlengkapan instalasi listrik yang tertulis pada PUIL 2011 dengan suatu keadaan/objek yang terdapat dilapangan sebagaimana adanya. Sumber data yang terdapat pada penelitian ini terdapat 2 macam yaitu data primer yaitu data yang diambil langsung pada objek penelitian dilakukan dengan 3 metode yaitu observasi, dokumentasi dan wawancara penduduk, sumber data kedua yaitu data sekunder yang diperoleh dari tokoh masyarakat setempat. Terdapat 6 aspek item uji pada instalasi grounding, Panel Hubung Bagi, Penghantar, Gawai Proteksi, Sakelar, dan Kotak kontak, dalam menentukkan persentase kelaikan yang didapatkan akan di sesuaikan dengan standar PUIL 2011. Hasil penelitian yang didapatkan adalah : tingkat kelaikan pada instalasi grounding terdapat 86,96% laik, dan 13,04% tidak laik, pada item uji PHB terdapat 69,56% laik, dan 30,43% tidak laik, pada item uji penghantar terdapat 39,13% laik, dan 60,87% tidak laik, pada item uji gawai proteksi terdapat 30,43% laik, dan 69,57% tidak laik, pada item uji sakelar terdapat 60,87% laik, dan 39,13% tidak laik, pada item uji kotak kontak terdapat 21,73% laik dan 78,26% tidak laik. Dengan hasil keseluruhan pada pemukiman rawan banjir ini terdapat 60,87%. Dengan hasil akhir terdapat satu rumah atau sebanyak 4,34% yang memuiliki kelaikan instalasi sebanyak 100% dan terdapat 22 rumah atau sebanyak 95,65% dengan kelaikan instalasi dibawah 100%. Electricity is a long-term necessity, therefore it needs to be maintained and inspected on a regular basis to keep electricity users safe. This study's goal was to evaluate the viability of PUIL 2011 regulations for domestic electrical installation equipment for flood-prone homes in Sawangan Asri and Sawangan Permai, Depok City, West Java. The aims of this research, which employs a quantitative descriptive methodology, is to compare the requirements for installing electrical installation equipment specified in PUIL 2011 with a real-world scenario or item. In this study, there are two different kinds of data sources: primary data, or information gathered directly from the research object by employing three different techniques: observation, documentation, and resident interviews. Secondary data collected from regional civic leaders is the second data source. Split Connection Panels, Conductors, Protection Devices, Switches, and Contact Boxes are the six test elements on grounding installations. The percentage of suitability that is attained will be modified to PUIL 2011 standards. Where the research results obtained are: the feasibility level of the grounding installation is 86.96% feasible, and 13.04% is not feasible, in the PHB test item there are 69.56% feasible, and 30.43% is not feasible, in the conductor test item there are 39.13% feasible, and 60.87% not feasible, in the protective device test items there are 30.43% feasible, and 69.57% not feasible, in the switch test items there are 60.87% feasible, and 39.13 % not feasible, the last test item, namely the contact box, is 21.73% feasible and 78.26% not feasible. Depending on the final results, one house, or up to 4.34%, has an installation feasibility of 100%, and 22 houses, or 95.65%, have an installation feasibility that is less than 100%.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Drs. Irzan Zakir, M.Pd ; 2). Ir. Drs. Parjiman, M.T. |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Energi > Energi Listrik |
Divisions: | FT > S1 Pendidikan Teknik Elektro |
Depositing User: | Users 16915 not found. |
Date Deposited: | 22 Feb 2023 02:15 |
Last Modified: | 22 Feb 2023 02:15 |
URI: | http://repository.unj.ac.id/id/eprint/37004 |
Actions (login required)
View Item |