ANALISIS PENERAPAN MANAJEMEN MATERIAL PROYEK KONSTRUKSI GEDUNG BERTINGKAT PADA PEKERJAAN STRUKTUR BETON SEBAGAI IMPLEMENTASI MATA KULIAH MANAJEMEN KONSTRUKSI

WIDYA FAKHRUNNISA NURMULYADI, . (2023) ANALISIS PENERAPAN MANAJEMEN MATERIAL PROYEK KONSTRUKSI GEDUNG BERTINGKAT PADA PEKERJAAN STRUKTUR BETON SEBAGAI IMPLEMENTASI MATA KULIAH MANAJEMEN KONSTRUKSI. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (258kB)
[img] Text
BAB 2.pdf
Restricted to Registered users only

Download (465kB) | Request a copy
[img] Text
BAB 3.pdf
Restricted to Registered users only

Download (367kB) | Request a copy
[img] Text
BAB 4.pdf
Restricted to Registered users only

Download (587kB) | Request a copy
[img] Text
BAB 5.pdf
Restricted to Registered users only

Download (242kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (313kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

Penelitian ini bertujuan untuk menganalisis bagaimana penerapan manajemen material proyek konstruksi serta melihat faktor penghambat dalam penerapan manajemen material pada Proyek Gedung MRT Hub (Simpang Temu) Dukuh Atas. Populasi pada penelitian ini berjumlah 28 orang yang merupakan staff kontraktor Proyek Gedung MRT Hub (Simpang Temu) Dukuh Atas. Metode dalam penelitian ini adalah menggunakan metode kuantitatif deskriptif dengan analisis data menggunakan SPSS versi 25 dan skala persentase. Hasil penyebaran kuesioner digunakan untuk mengetahui penerapan manajemen material pada Proyek Gedung MRT Hub (Simpang Temu) Dukuh Atas, diperkuat dengan hasil wawancara dengan salah satu staff Proyek Gedung MRT Hub (Simpang Temu) Dukuh Atas. Hasil penelitian ini menunjukkan bahwa pada pelaksanaan penerapan manajemen material pada Proyek Gedung MRT Hub (Simpang Temu) Dukuh Atas belum sepenuhnya dilakukan dengan baik. Dapat dilihat dari hasil penyebaran kuesioner yaitu (1) Perencanaan dan Penjadwalan Material menunjukkan nilai sebesar 89%. (2) Pengontrolan Produksi menunjukkan nilai sebesar 87%. (3) Lalu Lintas (Pengiriman Material) menunjukkan nilai sebesar 79%. (4) Penerimaan Material menunjukkan nilai sebesar 89%. (5) Penyimpanan Material menunjukkan nilai sebesar 86%. (6) Pengawasan Material menunjukkan nilai sebesar 90%. (6) Penggunaan Material menunjukkan nilai sebesar 67%. Perbandingan antara hasil wawancara dengan hasil kuesioner cukup signifikan, hal ini dikarenakan pelaksana manajemen material menyadari bahwa masih terdapat beberapa kendala dalam penerapanya. ***** This study aims to analyze how material management is implemented in construction projects and to see the inhibiting factors in implementing material management in the Dukuh Atas MRT Hub (Simpang Temu) Building Project. The population in this study amounted to 28 people who were staff of the Dukuh Atas MRT Hub (Simpang Temu) Building Project. The method in this research is to use a descriptive quantitative method with data analysis using SPSS version 25 and a percentage scale. The results of distributing the questionnaires were used to find out the application of materials management in the Dukuh Atas Hub MRT Building Project, reinforced by the results of an interview with one of the Dukuh Atas Hub MRT Building Project staff. The results of this study indicate that the implementation of materials management in the Dukuh Atas MRT Hub (Simpang Temu) Building Project has not been fully carried out properly. It can be seen from the results of distributing the questionnaires, namely (1) Material Planning and Scheduling shows a value of 89%. (2) Production Control shows a value of 87%. (3) Traffic (Material Delivery) shows a value of 79%. (4) Material Acceptance shows a value of 89%. (5) Material Storage shows a value of 86%. (6) Material Control shows a value of 90%. (6) Material use shows a value of 67%. The comparison between the results of the interviews and the results of the questionnaires is quite significant, this is because material management implementers realize that there are still some obstacles in their application.

Item Type: Thesis (Sarjana)
Additional Information: 1). Lenggogeni, M.T. ; 2). R. Eka Murtinugraha, M.Pd.
Subjects: Teknologi dan Ilmu Terapan > Teknik Sipil
Teknologi dan Ilmu Terapan > Konstruksi Bangunan
Divisions: FT > S1 Pendidikan Teknik Bangunan
Depositing User: Users 17367 not found.
Date Deposited: 06 Mar 2023 02:04
Last Modified: 06 Mar 2023 02:04
URI: http://repository.unj.ac.id/id/eprint/37978