HUDZAIFAH AFIFI, . (2023) ANALISA KEANDALAN SISTEM INSTALASI LISTRIK PADA GEDUNG RADEN AJENG KARTINI BERDASARKAN PUIL 2011. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
COVER.pdf Download (1MB) |
|
Text
BAB 1.pdf Download (225kB) |
|
Text
BAB 2.pdf Restricted to Registered users only Download (677kB) | Request a copy |
|
Text
BAB 3.pdf Restricted to Registered users only Download (278kB) | Request a copy |
|
Text
BAB 4.pdf Restricted to Registered users only Download (616kB) | Request a copy |
|
Text
BAB 5.pdf Restricted to Registered users only Download (132kB) | Request a copy |
|
Text
DAFTAR PUSTAKA.pdf Download (196kB) |
|
Text
LAMPIRAN.pdf Restricted to Registered users only Download (3MB) | Request a copy |
Abstract
Penelitian ini bertujuan untuk mengetahui keandalan pada komponen sistem instalasi listrik mencakup luas penampang penghantar kabel, kapasitas pengaman pemutus daya, dan penghantar proteksi berdasarkan PUIL 2011. Kriteria keandalan instalasi listrik mencakup keefektifan, keamanan, dan kontinuitas suplai daya listrik. Metode penelitian yang digunakan pada penelitian ini adalah analisa data dan observasi. Setelah data observasi terkumpul, dilakukan analisa data mengenai keandalan luas penampang penghantar kabel dengan membandingkan KHA kabel berdasarkan data pengukuran dengan standar KHA kabel pada PUIL 2011. Selain itu, data pengukuran juga digunakan dalam menentukan standar kualifikasi kapasitas pengaman pemutus daya yang terpasang. Sedangkan untuk menentukan keandalan penghantar proteksi mengacu pada standar PUIL 2011 mengenai luas minimum penghantar proteksi dengan cara membandingkan antara luas penampang kabel fasa dan penghantar proteksi. Tahap berikutnya, data yang sudah dianalisa kemudian ditentukan kualifikasi keandalan dari ketiga aspek komponen instalasi tersebut. Hasil penelitian menunjukkan bahwa luas penampang penghantar kabel pada panel memenuhi standar PUIL 2011. Kecuali untuk penghantar proteksi pada PHB Outdoor AC tidak memenuhi ukuran standar penghantar proteksi PUIL 2011. Untuk kapasits pengaman pemutus daya pada PHB Penerangan Lantai 1, PHB STP, dan PHB Outdoor AC tidak dapat mengantisipasi terhadap kemungkinan terjadinya beban lebih. Sedangkan untuk PHB lainnya kapasitas pengaman pemutus daya mampu mendeteksi terjadinya beban lebih sesuai dengan standar PUIL 2011. Pemakaian komponen instalasi listrik yang memenuhi standar PUIL 2011 adalah salah satu faktor yang dibutuhkan untuk mendukung keandalan penyaluran listrik khususnya di Gedung Raden Ajeng Kartini. ***** This study aims to determine the reliability of the components of the electrical installation system including the cross-sectional area of the cable conductor, the safety capacity of the power breaker, and the protection conductor based on PUIL 2011. Criteria for the reliability of the electrical installation include the effectiveness, safety and continuity of the supply of electric power. The research method used in this study is data analysis and observation. After the observation data has been collected, data analysis is carried out regarding the reliability of the cross-sectional area of the cable conductor by comparing the KHA of the cable based on the measurement data with the KHA standard of the cable in PUIL 2011. In addition, the measurement data is also used in determining the qualification standard for the safety capacity of the installed power breaker. Meanwhile, to determine the reliability of the protection conductor, it refers to the 2011 PUIL standard regarding the minimum area of the protection conductor by comparing the cross-sectional area of the phase cable and the protection conductor. In the next stage, the data that has been analyzed then determines the reliability qualifications of the three aspects of the installation component. The results showed that the cross-sectional area of the cable conductors on the panel met PUIL 2011 standards. Except for the protection conductors on PHB Outdoor AC, it did not meet the PUIL 2011 protection conductor sizes. cannot anticipate the possibility of overload. As for other PHBs, the safety capacity of the power breaker is able to detect the occurrence of overload in accordance with PUIL 2011 standards. The use of electrical installation components that meet PUIL 2011 standards is one of the factors needed to support the reliability of electricity distribution, especially in the Raden Ajeng Kartini Building.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Drs. Readysal Monantun, M.Pd. ; 2). Ir. Drs. Parjiman, M.T. |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Energi > Energi Listrik Teknologi dan Ilmu Terapan > Konstruksi Bangunan |
Divisions: | FT > S1 Pendidikan Teknik Elektronika |
Depositing User: | Users 19094 not found. |
Date Deposited: | 01 Sep 2023 05:34 |
Last Modified: | 01 Sep 2023 05:34 |
URI: | http://repository.unj.ac.id/id/eprint/39971 |
Actions (login required)
View Item |