EVALUASI INSTALASI LISTRIK PADA GEDUNG PT. INDOGLASS PUTRA JAYA DEPOK

FITRI FAJRI ARIFAH BERLIANI, . (2023) EVALUASI INSTALASI LISTRIK PADA GEDUNG PT. INDOGLASS PUTRA JAYA DEPOK. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (567kB)
[img] Text
BAB 1.pdf

Download (202kB)
[img] Text
BAB 2.pdf
Restricted to Registered users only

Download (663kB) | Request a copy
[img] Text
BAB 3.pdf
Restricted to Registered users only

Download (283kB) | Request a copy
[img] Text
BAB 4.pdf
Restricted to Registered users only

Download (445kB) | Request a copy
[img] Text
BAB 5.pdf
Restricted to Registered users only

Download (122kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (126kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

Penelitian ini bertujuan untuk menganalisis keseimbangan beban listrik pada panel hubung bagi dan instalasi listrik yang sesuai dengan standar PUIL 2020 serta membuat gambar intalasi listrik pada Gedung PT. Indoglass Putra Jaya. Metode yang digunakan dalam penelitian ini yaitu metode evaluasi berupa studi kasus dan observasi dengan metode penelitian tindakan dan analisis deskriptif dengan pendekatan kuantitatif. Pengambilan data dilakukan melalui instrumen observasi berdasarkan Peraturan Menteri Energi dan Sumber Daya Mineral No. 12 Tahun 2021 tentang Instalasi Pemanfaatan Tenaga Listrik Tegangan Rendah lampiran X. Hasil penelitian menunjukan: (1) gambar instalasi listrik tidak ada; (2) penghantar pembumian, komponen peralatan pengaman arus lebih dan arus sisa tidak terpasang di seluruh instalasi listrik; (3) ukuran penghantar sesusai PUIL 2020, setiap sirkit ukuran penghantar tidak melebihi kuat hantar arus yang mengalir pada kebutuhan yang disuplai. Penggunaan warna insulasi tidak sesuai standar PUIL; (4) pemasangan komponen instalasi listrik sesuai standar PUIL 2020; (5) pemasangan kotak kontak dan ketinggian PHB sudah sesuai PUIL 2020; (6) kelengkapan instalasi listrik yang terpasang seluruhnya sudah tersertifikasi Standar Nasional Indonesia; (7) keseimbangan beban pada fasa R S T panel hubung bagi belum seimbang. Kesimpulan hasil penelitian menunjukan beban belum seimbang dan presentase standar PUIL 2020 sebesar 69,88%, dengan klasifikasi Instalasi Listrik ada yang tidak sesuai PUIL 2020 dan instalasi listrik layak operasi. ***** This study aims to analyze the balance of the electrical load on the connecting panels and electrical installations in accordance with PUIL 2020 standards and to make drawings of electrical installations in the PT. Indoglass Putra Jaya. The method used in this research is the evaluation method in the form of case studies and observation with action research methods and descriptive analysis with a quantitative approach. Data collection was carried out through observation instruments based on the Regulation of the Minister of Energy and Mineral Resources No. 12 of 2021 concerning Installations for the Utilization of Low Voltage Electricity, attachment X. The results of the study show: (1) there are no electrical installation drawings; (2) earth conductors, overcurrent and residual current protection equipment components are not installed in all electrical installations; (3) the size of the conductor is according to PUIL 2020, each circuit of the conductor size does not exceed the carrying capacity of the current flowing according to the needs supplied. The use of insulation colors does not comply with PUIL standards; (4) installation of electrical installation components according to PUIL 2020 standards; (5) the installation of the contact box and the height of the PHB are in accordance with PUIL 2020; (6) all electrical installations have been certified by the Indonesian National Standard; (7) the load balance on the R S T phase of the dividing panel is not balanced. The conclusion of the research results shows that the load is not balanced and the percentage of PUIL 2020 standards is 69.88%, with the classification of electrical installations that are not in accordance with PUIL 2020 and electrical installations that are feasible for operation.

Item Type: Thesis (Sarjana)
Additional Information: 1). Dr. Aris Sunawar,S.Pd., M.T. ; 2). Ir. Drs. Parjiman, M.T.
Subjects: Teknologi dan Ilmu Terapan > Teknik Energi > Energi Listrik
Teknologi dan Ilmu Terapan > Teknik Elektronika
Divisions: FT > S1 Pendidikan Teknik Elektro
Depositing User: Users 19092 not found.
Date Deposited: 29 Aug 2023 01:42
Last Modified: 29 Aug 2023 01:42
URI: http://repository.unj.ac.id/id/eprint/39974

Actions (login required)

View Item View Item