MUCHADI, . (2024) STUDI PEMBANGKIT LISTRIK TENAGA PIKOHIDRO DI KAMPUNG TEGAL PUTAT DESA SUKASIRNA KECAMATAN JONGGOL KABUPATEN BOGOR. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
COVER SANGAT TERBARU.pdf Download (779kB) |
|
Text
bab 1 pendahuluan.pdf Download (101kB) |
|
Text
bab 2 landasan teori.pdf Restricted to Registered users only Download (577kB) | Request a copy |
|
Text
bab 3 metodelogi.pdf Restricted to Registered users only Download (748kB) | Request a copy |
|
Text
bab 4 hasil dan pembahasan.pdf Restricted to Registered users only Download (336kB) | Request a copy |
|
Text
bab 5 kesimpulan dan saran.pdf Restricted to Registered users only Download (155kB) | Request a copy |
|
Text
bab daftar pustaka.pdf Download (148kB) |
|
Text
lampiran dan daftar riwayat hidup.pdf Restricted to Registered users only Download (720kB) | Request a copy |
Abstract
ABSTRAK Muchadi, STUDI PEMBANGKIT LISTRIK TENAGA PIKO HIDRO DI KAMPUNG TEGAL PUTAT DESA SUKASIRNA KECAMATAN JONGGOL KABUPATEN BOGOR. Dosen Pembimbing: Prof. Dr.Suyitno, M.Pd. dan Dr. Daryanto, MT. Peneletian ini bertujuan membuat rancang bangun pembangkit listrik tenaga pikohidro yang berlokasi di Kampung Tegal Putat Desa Sukasirna Kecamatan Jonggol Kabupaten Bogor dengan kapasitas generator 300 Watt untuk digunakan sebagai penerangan jalan. Dalam Penelitian ini, metode penelitian yang digunakan dan diterapkan adalah metode studi kasus dengan pemanfaatan air sungai yang sudah terukur 0,065 m^3/detik untuk menggerakkan turbin pelton yang dalam pembuatanya dengan menggunakan velg sepeda motor yang telah dimodifikasi dengan diberikan bilah-bilah adapun jumlah keseluruhan bilah sebanyak 24 bilah. Ukuran bilah 9 cm x 9 cm dengan membentuk sudu 90 derajat yang terkopel dengan generator, dimana nantinya energi kinetik dari turbin pelton akan diubah menjadi energi listrik oleh generator, pengujian turbin tanpa beban di lakukan secara langsung di sungai dengan putaran rata-rata sebesar 2440,2 dan pengujian putaran generator yang sudah terhubung ke turbin dengan rata-rata sebesar 816,7. Kemudian akan dilakukan pengujian dan pengukuran tegangan serta arus listrik. Pengujian serta pengukuran ini dilakukan dengan menggunakan alat ukur multimeter, watt meter dan stopwatch. Berdasarkan pengujian tersebut, arus rata-rata yang di hasilkan 1,67 amper. Besarnya debit air akan mempengaruhi besar tegangan, arus, serta daya keluaran generator. Kapasitas baterai 12 Volt, 25 AH atau 240 WH digunakan untuk menyalakan lampu 9 Buah, (daya listrik lampu 9 Watt perbuah) dengan daya listrik 240 WH (Baterai keadaan penuh) dapat menerangkan lampu LED jalan di Kampung Tegal Putat Desa Sukasirna Kecamatan Jonggol Kabupaten Bogor selama 12 jam. Hasil pengukuran dilokasi generator yang dihasilkan rata-rata adalah 50,38 Watt. Hasil daya listrik tersebut sedang karna kondisi aliran yang tidak stabil mempengaruhi kecepatan alirian sungai, sehingga turbin untuk penggerak generator tidak stabil. Untuk kedepannya rancang bangun pembangkit listrik tenaga pikohidro ini dapat disempurnakan kedepannya dengan menambah bak/tampungan air agar kecepatan yang keluar lebih konstan dan sebagai obyek penelitian. Kata Kunci : Pembangkit listrik Tenaga Piko hidro, Turbin Pelton, Generator. ***** ABSTRAK Muchadi. STUDY OF MICROHYDRO POWER PLANT IN TEGAL PUTAT VILLAGE, SUKASIRNA SUBDISTRICT, JONGGOL DISTRICT, BOGOR REGENCY. Supervisor: Prof. Dr. Suyitno, M.Pd. and Dr. Daryanto, MT. This research aims to create a design for a picohydro power plant located in Tegal Putat Village, Sukasirna Village, Jonggol District, Bogor Regency with a generator capacity of 300 Watts to be used as street lighting. In this research, the research method used and applied is an case study using river water measuring 0.065 m³/second to drive a pelton turbine which is made using motorbike rims that have been modified by providing blades as for the total number of a total of 24 blades. The size of the blade is 9 cm x 9 cm by forming a 90 degree blade which is coupled to the generator, where later the kinetic energy from the Pelton turbine will be converted into electrical energy by the generator. Testing the turbine without load was carried out directly in the river with an average rotation of 2440.2 and testing the generator rotation that is connected to the turbine with an average of 816,7. Then tests and measurements of voltage and electric current will be carried out. This test and measurement is carried out using a multimeter, watt meter and stopwatch. Based on this test, the average current produced is 1.67 amperes. The amount of air discharge will affect the amount of voltage, current and generator output power. A battery capacity of 12 Volts, 25 AH or 240 WH is used to light 9 lights, (9 Watt lamp power per fruit) with 240 WH power (battery fully charged) can illuminate LED street lights in Tegal Putat Village, Sukasirna Village, Jonggol District, Bogor Regency for 12 hours. The results of measurements at the generator location produced an average of 50.38 Watts. The electrical power output is moderate because unstable flow conditions affect the speed of river flow, so that the turbine to drive the generator is unstable. In the future, the design of this picohydro power plant can be improved in the future by adding water tanks/storages so that the exit velocity is more constant and as an object of research. Key Word : Piko hydro power plants, Pelton Turbines, Generators.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Prof. Dr. Suyitno., M.Pd ; 2). Dr. Daryanto, M.T |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Energi > Energi Listrik |
Divisions: | FT > S1 Pendidikan Teknik Elektro |
Depositing User: | Users 23468 not found. |
Date Deposited: | 05 Aug 2024 00:26 |
Last Modified: | 05 Aug 2024 00:26 |
URI: | http://repository.unj.ac.id/id/eprint/47124 |
Actions (login required)
View Item |