ANALISIS KEBUTUHAN ENERGI LISTRIK TAHUN 2019 - 2029 MENGGUNAKAN METODE GABUNGAN (STUDI KASUS DI PT. PLN (PERSERO) UP3 SUKABUMI)

DESITHA ROSYANTI, . (2020) ANALISIS KEBUTUHAN ENERGI LISTRIK TAHUN 2019 - 2029 MENGGUNAKAN METODE GABUNGAN (STUDI KASUS DI PT. PLN (PERSERO) UP3 SUKABUMI). Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (1MB)
[img] Text
BAB I.pdf

Download (210kB)
[img] Text
BAB II.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB III.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[img] Text
BAB V.pdf

Download (125kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (384kB)
[img] Text
LAMPIRAN.pdf

Download (1MB)

Abstract

Tujuan dari penelitian ini adalah mengetahui kebutuhan energi listrik selama 10 tahun ke depan (Tahun 2019-2029) menggunakan metode gabungan di PT. PLN (Persero) UP3 Sukabumi. Prakiraan kebutuhan energi listrik merupakan prakiraan masa yang akan datang dengan menggunakan data histori. Prakiraan dapat dijadikan sebuah gambaran di tahun yang akan datang tentang jumlah kebutuhan beban energi listrik. Meningkatnya jumlah penduduk di wilayah Sukabumi berbanding sama dengan kebutuhan energi listrik. Produk Domestik Regional Bruto (PDRB), jumlah pelanggan listrik, serta adanya perkembangan infrastruktur dapat mempengaruhi prakiraan permintaan kebutuhan energi listrik. Metode gabungan merupakan gabungan beberapa metode seperti metode ekonometri, analitis, dan kecenderungan dengan pendekatan sektoral untuk melakukan prakiraan kebutuhan energi listrik. Hasil perhitungan prakiraan kebutuhan energi listrik dalam penelitian ini menyatakan bahwa jumlah penduduk, PDRB, jumlah pelanggan listrik serta kebutuhan energi listrik mengalami kenaikan. Hasil perhitungan laju penduduk Sukabumi 0,36% per tahun; laju pertumbuhan PDRB Sukabumi 6,26%; jumlah pelanggan listrik sektor rumah tangga 5,26%, jumlah pelanggan listrik sektor komersil 13,96%, jumlah pelanggan listrik sektor publik 7,58%, jumlah pelanggan listrik sektor industri 3,53%. Maka, dapat disimpulkan bahwa kenaikan kebutuhan energi listrik sebesar 3.080,83 Gwh dengan rata-rata pertumbuhan per tahun 10,69%. Kata Kunci: Kebutuhan Energi Listrik, Metode Gabungan, Prakiraan   The purpose of this study is to determine the electrical energy load needed for 10 years (2019-2029) using the combined method in PT. PLN (Persero) UP3 Sukabumi. Forecasting electrical energy load needs is a forecast of the future that will come using historical data. The result of the forecast can be a picture in the coming year about the amount of energy needs The increasing number of population in the Sukabumi region is proportional to the electricity needs. Gross Regional Domestic Product (GRDP), the number of electricity customers, and also the growth of infrastructure can affect the demand forecast for electricity needs. The combined method is a combination of several methods such as econometrics, analytical methods, and trends with a sectoral approach to projecting electricity demand. The results of the calculation of forecasts in this study stated that the population, GRDP, number of electricity customers and the need for an electrical energy load have increased. The results of the calculation of the population rate of Sukabumi 0,36% per year; Sukabumi's GRDP growth rate of 6,26%; electricity customers in the household sector by 5,26%, customers in the commercial sector by 13.96%, electricity customers in the public sector by 7,58% and the number of electricity customers in the industrial sector by 3.53%. So, it can be concluded that the increase in electrical energy load needs is 3.080,83 Gwh with an average growth of 10,69% per year. Keyword: Electrical Energy Requirements, Combined Methods, Forecasts

Item Type: Thesis (Sarjana)
Additional Information: 1). Massus Subekti, S.Pd., MT 2). Imam Arif Rahardjo, S.Pd., MT
Subjects: Teknologi dan Ilmu Terapan > Teknik Energi
Divisions: FT > S1 Pendidikan Teknik Elektro
Depositing User: Users 1679 not found.
Date Deposited: 03 Mar 2020 14:31
Last Modified: 03 Mar 2020 14:31
URI: http://repository.unj.ac.id/id/eprint/4921

Actions (login required)

View Item View Item