LAYYINATUSSHIFAH, . (2025) PEMODELAN DAN PERHITUNGAN KEMBALI RENCANA ANGGARANA BIAYA DENGAN TEKNOLOGI BUILDING INFORMATION MODELLING (BIM) PADA PEKERJAAN ARSITEKTUR DAN MEP (STUDI KASUS GRAHA PEMUDA KOMPLEKS KATEDRAL JAKARTA). Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
![]() |
Text
BAB III.pdf Download (338kB) |
![]() |
Text
BAB V.pdf Download (198kB) |
![]() |
Text
BAB II.pdf Restricted to Registered users only Download (436kB) | Request a copy |
![]() |
Text
BAB I.pdf Restricted to Registered users only Download (291kB) | Request a copy |
![]() |
Text
BAB IV.pdf Restricted to Registered users only Download (1MB) | Request a copy |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (194kB) |
![]() |
Text
LAMPIRAN.pdf Restricted to Registered users only Download (2MB) | Request a copy |
![]() |
Text
COVER.pdf Download (568kB) |
Abstract
Layyinatusshifah, Adhi Purnomo, M.T, Rezi Berliana Yasinta, M.T (2024) “Pemodelan dan perhitungan kembali rencana anggarana biaya dengan teknologi Building Information Modelling (BIM) pada pekerjaan arsitektur dan MEP (Studi kasus graha pemuda kompleks katedral Jakarta)”. Skripsi, Jakarta: Program Studi Teknologi rekayasa Konstruksi Bangunan Gedung, Fakultas Teknik, Universitas Negeri Jakarta. Permasalahan yang terjadi pada proyek pembangunan Graha Pemuda Kompleks Katedral Jakarta adalah adanya perubahan desain pada pekerjaan arsitekur dan MEP. Karena adanya perubahan desain pada pekerjaan arsitektur dan MEP sesuai dengan keinginan owner, sehingga harus dilakukan pemodelan ulang pada pekerjaan tersebut yang tentunya akan berdampak pada perhitungan volume serta rencana anggaran biaya yang harus disesuaikan dengan data terbaru. Berdasarkan permasalahan di atas tujuan dari penelitian ini adalah menerapkan BIM dalam proses desain, perhitungan volume yang akurat sebagai acuan dalam rencana anggaran biaya proyek. Produk ini dibuat untuk memaksimalkan proses perencanaan agar lebih mudah, tetapi juga memberikan dasar yang lebih kuat untuk estimasi biaya yang lebih akurat. Dalam penelitian ini akan menggunakan metode Research and Development dengan model pengembangan 4-D yang terdiri dari define (pendefinisian), design (perancangan), develop (pengembangan), dan disseminate (penyebaran). Penelitian ini mampu menghasilkan model 3D pekerjaan arsitektur dan MEP serta volume pekerjaan sebagai acuan dalam perhitungan anggaran biaya. Pada perhitungan anggaran biaya yang dihasilkan terdapat selisih yang menunjukkan bahwa RAB arsitektur lebih kecil sebesar 2,06%, sedangkan RAB MEP lebih kecil sebesar 5,75% dibandingkan dengan RAB konvensional. hal ini menunjukkan bahwa perhitungan volume pekerjaan menjadi lebih akurat dan efisien, sehingga dapat menghasilkan penghematan anggaran yang cukup besar. Kata kunci: Autodesk Revit, Building Information Modelling, Rencana Anggaran Biaya, Quantity Take Off ***** Layyinatusshifah, Adhi Purnomo, M.T, Rezi Berliana Yasinta, M.T (2024) “Modelling and recalculation of cost budget plan with Building Information Modelling (BIM) technology on architectural and MEP works (Case study of youth complex of Jakarta cathedral)”. Thesis, Jakarta: Department of Building Construction Engineering Technology, Faculty of Engineering, Universitas Negeri Jakarta. The problem that occurs in the Graha Pemuda construction project of the Jakarta Cathedral Complex is that there are design changes in architectural and MEP work. Due to design changes in architectural and MEP work in accordance with the wishes of the owner, so that remodeling must be done on the work which of course will have an impact on volume calculations and cost budget plans that must be adjusted to the latest data. Based on the above problems, the purpose of this research is to apply BIM in the design process, accurate volume calculations as a reference in the project cost budget plan. This product is made to maximize the planning process to be easier, but also provide a stronger basis for more accurate cost estimation. This research will use the Research and Development method with the 4-D development model consisting of define, design, develop, and disseminate. This research is able to produce 3D models of architectural and MEP work and the volume of work as a reference in the calculation of the cost budget. In the calculation of the resulting cost budget, there is a difference that shows that the architectural RAB is smaller by 2.06%, while the MEP RAB is smaller by 5.75% compared to the conventional RAB. this shows that the calculation of the volume of work becomes more accurate and efficient, so that it can produce considerable budget savings. Keywords: Autodesk Revit, Building Information Modelling, Cost Budget Plan, Quantity Take Off
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Adhi Purnomo, M.T. ; 2). Rezi Berliana Yasinta, M.T. |
Subjects: | Teknologi dan Ilmu Terapan > Konstruksi Bangunan |
Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
Depositing User: | Users 27292 not found. |
Date Deposited: | 05 Mar 2025 01:50 |
Last Modified: | 05 Mar 2025 01:50 |
URI: | http://repository.unj.ac.id/id/eprint/54475 |
Actions (login required)
![]() |
View Item |