TINJAUAN PERHITUNGAN RAB PEMBANGUNAN GEDUNG BERDASARKAN PERMEN PUPR NO. 1 TAHUN 2022 (Pada Pembangunan Ruang Kelas Baru Madrasa Tsanawiya Negeri 6 Maluku Tengah)

Patty, Marvin Patrick and Frans, Pieter Lourens and Gaspersz, Willem (2024) TINJAUAN PERHITUNGAN RAB PEMBANGUNAN GEDUNG BERDASARKAN PERMEN PUPR NO. 1 TAHUN 2022 (Pada Pembangunan Ruang Kelas Baru Madrasa Tsanawiya Negeri 6 Maluku Tengah). Menara: Jurnal Teknik Sipil, 19 (1). pp. 89-100. ISSN 1907-4360

Full text not available from this repository.
Official URL: https://doi.org/10.21009/jmenara.v19i1.39388

Abstract

Cost budget plan is a careful cost budget planning needed in the implementation of the construction of a project that contains budget details in the form of workers' wages, material costs and tools to be used. The Ministry of Public Works issued an Analysis of the Unit Price of Work in 2016 and updated with the Analysis of the Unit Price of Work 2022 issued on January 5, 2022 through Public Works and Public Housing Regulation number 1 of 2022. In the new classroom construction project, MTS N 6 Central Maluku uses the calculation of the project cost budget according to Unit Price Analysis of Work Minister of Public Works and Public Housing number 28/PRT/2016, this is because planning was carried out before the issuance of Unit Price Analysis of Work 2022. With the Unit Price Analysis of Work update in 2022, the author will use Public Works and Public Housing Regulation number 1 of 2022 as a basis for review to analyze the Cost Budget Plan for the MTS N 6 Central Maluku project.

Item Type: Article
Subjects: Teknologi dan Ilmu Terapan > Konstruksi Bangunan
Depositing User: OJS LPPM UNJ .
Date Deposited: 06 Mar 2025 03:52
Last Modified: 06 Mar 2025 03:52
URI: http://repository.unj.ac.id/id/eprint/54922

Actions (login required)

View Item View Item