YANUAR HARDIAN FADILLAH, . (2025) PENERAPAN BIM PADA PERHITUNGAN RAB TERHADAP ELEMEN ARSITEKTUR DAN MEP AKIBAT PERUBAHAN ELEVASI LANTAI DI PROYEK SMPN 117 JAKARTA. Diploma thesis, UNIVERSITAS NEGERI JAKARTA.
![]() |
Text
COVER.pdf Download (555kB) |
![]() |
Text
BAB 1.pdf Download (276kB) |
![]() |
Text
BAB 2.pdf Restricted to Registered users only Download (471kB) | Request a copy |
![]() |
Text
BAB 3.pdf Restricted to Registered users only Download (500kB) | Request a copy |
![]() |
Text
BAB 4.pdf Restricted to Registered users only Download (2MB) | Request a copy |
![]() |
Text
BAB 5.pdf Restricted to Registered users only Download (253kB) | Request a copy |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (224kB) |
![]() |
Text
LAMPIRAN.pdf Restricted to Registered users only Download (745kB) | Request a copy |
Abstract
Penelitian mengenai penerapan Building Information Modeling (BIM) di Indonesia masih terbatas pada aspek perencanaan secara umum. Literatur yang berkaitan dengan dampak perubahan elevasi lantai 1 terhadap elemen arsitektur dan MEP, deteksi tumbukan, perhitungan volume dan RAB masih jarang. Perubahan elevasi lantai pada proyek SMPN 117 Jakarta mengindikasikan perlunya kajian lebih lanjut, sehingga peneliti melakukan penelitian “Penerapan BIM pada Perhitungan RAB Elemen Arsitektur dan MEP Akibat Perubahan Elevasi Lantai pada Proyek SMPN 117 Jakarta”. Penelitian ini bertujuan untuk mengaplikasikan teknologi BIM dengan menggunakan software Autodesk Revit untuk memodelkan elemen-elemen arsitektur dan MEP, menggunakan Autodesk Navisworks Manage untuk mengatasi clash detection, serta menghitung volume pekerjaan dan RAB. Metode penelitian yang digunakan adalah Research and Development (R&D) dengan model pengembangan 4D, yang terdiri dari tahap Define, Design, Develop, dan Disseminate. Penelitian dilakukan selama empat bulan, dari bulan Februari hingga Juni 2025, di gedung SMPN 117 Jakarta yang beralamat di Jalan Taruna Pahlawan Revolusi, Pondok Bambu, Kecamatan Duren Sawit, Jakarta Timur, dengan luas area 5.532 m². Hasil penelitian menunjukkan bahwa penerapan teknologi BIM pada proyek SMPN 117 Jakarta setelah dilakukan perubahan elevasi mampu mengidentifikasi benturan elemen secara akurat (Clash Detection), menghasilkan pemodelan elemen arsitektur dan MEP yang lebih efisien, serta mempermudah perhitungan volume pekerja untuk dilakukan perhitungan RAB dengan membandingkan antara RAB konvensional dengan RAB melalui BIM. Perhitungan RAB menunjukkan bahwa nilai RAB konvensional sebesar Rp13.194.986.099, sedangkan RAB berbasis BIM sebesar Rp12.563.153.837, sehingga terdapat selisih sebesar Rp631.832.262. Hal ini membuktikan bahwa penggunaan BIM dalam proses perencanaan dan estimasi biaya lebih efisien dibandingkan metode konvensional. Kata Kunci: Building Information Modeling, Arsitektur, Mekanikal Elektrikal Plumbing, Rencana Anggaran Biaya. ***** Research on the application of Building Information Modeling (BIM) in Indonesia is still limited to general planning aspects. Literature related to the impact of elevation changes on architectural and MEP elements, collision detection, and volume and RAB calculations are still rare. Changes in floor elevation in the SMPN 117 Jakarta project indicate the need for further study, so the researcher conducted a study “Application of BIM to RAB Calculation of Architectural and MEP Elements Due to Changes in Floor Elevation in the SMPN 117 Jakarta Project”. This research aims to apply BIM technology by using Autodesk Revit software to model architectural and MEP elements, using Autodesk Naviswork to overcome clash detection, and calculate the volume of work and RAB. The research method used is Research and Development (R&D) with the 4D development model, which consists of Define, Design, Develop, and Disseminate stages. The research was conducted for four months, from February to June 2025, at the SMPN 117 Jakarta building located at Taruna Pahlawan Revolusi Street, Pondok Bambu, Duren Sawit District, East Jakarta, with an area of 5,532 m². The research results show that the application of BIM technology in the SMPN 117 Jakarta project was able to accurately identify element collisions (Clash Detection), produce more efficient architectural and MEP element modeling, and facilitate the calculation of work volumes for RAB calculations by comparing conventional RAB with BIM-based RAB. Cost estimation calculations show that the conventional cost estimate amounts to Rp13,194,986,099, while the BIM-based cost estimate amounts to Rp12,563,153,837, resulting in a difference of Rp631,832,262. This demonstrates that the use of BIM in the planning and cost estimation process is more efficient than conventional methods. Keywords: Building Information Modeling, Architecture, Mechanical Electrical Plumbing, Cost Budget Plan.
Item Type: | Thesis (Diploma) |
---|---|
Additional Information: | 1). Adhi Purnomo, M.T. ; 2). Muh Abdhy Gazali HS, M.T. |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil Teknologi dan Ilmu Terapan > Konstruksi Bangunan |
Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
Depositing User: | Yanuar Hardian Fadillah . |
Date Deposited: | 11 Aug 2025 02:32 |
Last Modified: | 11 Aug 2025 02:32 |
URI: | http://repository.unj.ac.id/id/eprint/59526 |
Actions (login required)
![]() |
View Item |