YUDA ANGGARA, . (2025) PENERAPAN BUILDING INFORMATION MODELLING (BIM) 4D DALAM PERENCANAAN PENJADWALAN AKIBAT PERUBAHAN VOLUME PADA PEMBANGUNAN GEDUNG PMI JAKARTA. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
![]() |
Text
COVER.pdf Download (952kB) |
![]() |
Text
BAB I.pdf Download (321kB) |
![]() |
Text
BAB II.pdf Restricted to Registered users only Download (543kB) | Request a copy |
![]() |
Text
BAB III.pdf Restricted to Registered users only Download (1MB) | Request a copy |
![]() |
Text
BAB IV.pdf Restricted to Registered users only Download (1MB) | Request a copy |
![]() |
Text
BAB V.pdf Restricted to Registered users only Download (256kB) | Request a copy |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (191kB) |
![]() |
Text
LAMPIRAN.pdf Restricted to Registered users only Download (3MB) | Request a copy |
Abstract
Penelitian ini bertujuan untuk meminimalisir potensi penambahan durasi waktu penjadwalan yang terjadi pada bangunan gedung PMI Jakarta karena adanya perubahan perhitungan volume pekerjaan tambahan akibat benturan elemen atau *clash* menggunakan gambar 2D AutoCAD dan penjadwalan konvensional kurva S. Tujuan penelitian ini adalah memanfaatkan Building Information Modelling (BIM) 4D pada pekerjaan struktur, arsitektur dan MEP pada gedung PMI Jakarta untuk membuat rencana penjadwalan dengan *Microsoft Project* sebagai software penjadwalan proyek, melakukan simulasi penjadwalan berbabis BIM, dan membandingkan hasil durasi waktu secara menyeluruh antara durasi penjadwalan konvensional dan durasi penjadwalan berbasis BIM. Rumusan masalah pada penelitian ini menandakan apakah penggunaan BIM akan menghasilkan perbandingan durasi yang lebih cepat dengan informasi yang lebih rinci dibanding metode konvensional. Metode penelitian yang digunakan adalah *Research and Development* (R&D) dengan pendekatan model pengembangan 4D yang mencakup tahap *Define, Design, Develop, dan Disseminate*. Proses penelitian melibatkan integrasi data model 3D dari elemen Struktur, Arsitektur, dan MEP dengan data penjadwalan proyek dari *Microsoft Project*. Rencana penjadwalan dilakukan untuk menghasilkan jadwal yang lebih realistis. Deteksi clash detection dilakukan untuk mengidentifikasi benturan antar elemen pekerjaan. Produk yang dihasilkan berupa visualisasi simulasi rencana penjadwalan proyek. Hasil penerapan BIM 4D antara model dengan rancangan penjadwalan *Microsoft Project* dengan perubahan volume pada elemen pekerjaan mampu meminimalisir potensi penambahan durasi waktu penjadwalan sebesar 17 hari dengan total durasi 334 hari kalender kerja dibandingkan durasi realisasi pada proyek sebesar 351 hari kalender kerja. ***** This research aims to minimize the potential increase in the duration of scheduling time that occurs in the PMI Jakarta building due to changes in the calculation of additional work volumes due to element collisions or clashes using 2D AutoCAD drawings and conventional S-curve scheduling. The purpose of this research is to utilize Building Information Modeling (BIM) 4D on structural, architectural and MEP work on the PMI Jakarta building to create a scheduling plan with Microsoft Project as project scheduling software, simulate BIM-based scheduling, and compare the overall time duration results between conventional scheduling duration and BIM-based scheduling duration. The formulation of the problem in this study indicates whether the use of BIM will produce a faster duration comparison with more detailed information than conventional methods. The research method used is Research and Development (R&D) with a 4D development model approach that includes the Define, Design, Develop, and Disseminate stages. The research process involved integrating 3D model data from Structure, Architecture, and MEP elements with project scheduling data from Microsoft Project. A scheduling plan is performed to produce a more realistic schedule. Clash detection is done to identify clashes between work elements. The resulting product is a visualization of the project scheduling plan simulation. The results of the application of BIM 4D between the model and the Microsoft Project scheduling design with volume changes in the work elements are able to minimize the potential for additional duration of scheduling time by 17 days with a total duration of 334 working calendar days compared to the duration of realization in the project of 351 working calendar days.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Adhi Purnomo, M.T. ; 2). Mirara Khanza, M.T. |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil Teknologi dan Ilmu Terapan > Konstruksi Bangunan |
Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
Depositing User: | Yuda Anggara . |
Date Deposited: | 12 Aug 2025 03:01 |
Last Modified: | 12 Aug 2025 03:01 |