RAIHAN KAZAM MEINDITO, . (2026) PERMODELAN 3D DAN PERHITUNGAN ULANG RENCANA ANGGARAN BIAYA MEP DENGAN PENERAPAN BIM PADA GEDUNG GIS 150 KV DI CIKARANG. Diploma thesis, UNIVERSITAS NEGERI JAKARTA.
|
Text
COVER.pdf Download (2MB) |
|
|
Text
BAB I.pdf Download (2MB) |
|
|
Text
BAB II.pdf Restricted to Registered users only Download (878kB) | Request a copy |
|
|
Text
BAB III.pdf Restricted to Registered users only Download (532kB) | Request a copy |
|
|
Text
BAB IV.pdf Restricted to Registered users only Download (3MB) | Request a copy |
|
|
Text
BAB V.pdf Restricted to Registered users only Download (299kB) | Request a copy |
|
|
Text
DAFTAR PUSTAKA.pdf Download (321kB) |
|
|
Text
LAMPIRAN.pdf Restricted to Registered users only Download (1MB) | Request a copy |
Abstract
Pada Gedung GIS 150 kV Cikarang terjadinya perubahan desain pada pekerjaan MEP dikarenakan adanya perubahan perintah kerja yang berdampak pada ketidaksesuaian volume pekerjaan dan biaya antara rencana awal dengan kondisi aktual di lapangan. Permasalahan ini berdampak pada diperlukannya perhitungan ulang volume dan biaya yang mana dalam praktiknya masih dilakukan secara manual. Dilaksanakannya penelitian ini bertujuan untuk menerapkan Building Information Modeling (BIM) sebagai solusi pada permasalahan perubahan desain MEP yang terjadi dengan melakukan permodelan 3D elemen MEP menggunakan Software Cubicost Take-off Mechanichal Electrical (TME) yang nantinya akan terhitung secara otomatis volume dari pekerjaan MEP, dilanjutkan dengan perhitungan biaya dengan Software Cubicost Take-off Bill of Quantities (TBQ). Metode penelitian yang digunakan adalah Research and Development (R&D) dengan model pengembangan 4D yang terdiri dari tahapan Define, Design, Develop, dan Disseminate. Hasil penelitian ini menunjukkan perhitungan biaya berdasarkan kontrak adalah Rp3.601.893.492, sedangkan perhitungan biaya berdasarkan penerapan BIM adalah sebesar Rp3.519.511.578 dengan selisih biaya sebesar Rp82.381.913 yaitu dengan persentase 2,29%. Selisih tersebut menunjukkan bahwa penerapan BIM dalam perhitungan biaya cenderung lebih akurat dan realistis karena memperhitungkan kondisi sebenarnya di lapangan secara detail dan menyeluruh. Oleh karena itu, penerapan BIM layak dijadikan pertimbangan dalam perencanaan dan pelaksanaan proyek konstruksi, khususnya pada proyek gedung berskala menengah hingga besar. ***** At the 150 kV GIS Building in Cikarang, a design change occurred in the MEP works due to a change in work order, which resulted in a discrepancy between the planned work volume and cost and the actual conditions in the field. This issue creates the need for recalculating the volume and cost, which in practice is still carried out manually. This research aims to apply Building Information Modeling (BIM) as a solution to the MEP design change problem by creating a 3D model of the MEP elements using Cubicost Take-off Mechanical Electrical (TME) Software, which automatically calculates the volume of MEP work, followed by cost calculation using Cubicost Take-off Bill of Quantities (TBQ) Software. The research method used is Research and Development (R&D) with a 4D Development model consisting of the Define, Design, Develop, and Disseminate stages. The results show that the cost calculation based on the contract amounts to IDR 3,601,893,492, while the cost calculation based on BIM implementation amounts to IDR 3,519,511,578, resulting in a cost difference of IDR 82,381,913 or 2.29%. This difference indicates that the implementation of BIM in cost calculation tends to be more accurate and realistic because it accounts for the actual field conditions in a detailed and comprehensive manner. Therefore, the implementation of BIM is worth considering in the planning and execution of construction Projects, particularly for medium to large scale building Projects.
| Item Type: | Thesis (Diploma) |
|---|---|
| Additional Information: | 1). Adhi Purnomo, M.T. 2). Rezi Berliana Yasinta, M.T. |
| Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil Teknologi dan Ilmu Terapan > Konstruksi Bangunan |
| Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
| Depositing User: | Raihan Kazam Meindito . |
| Date Deposited: | 20 Aug 2026 01:38 |
| Last Modified: | 20 Aug 2026 01:38 |
| URI: | http://repository.unj.ac.id/id/eprint/71823 |
Actions (login required)
![]() |
View Item |