KELAYAKAN INSTALASI LISTRIK TEGANGAN RENDAH PADA BANGUNAN BERTINGKAT BERDASARKAN PUIL 2011 (Studi Kasus pada Bangunan Gudang dan Kantor J&T Gateway Rawa Bokor, Tangerang)

RIZAL SUBEKTI, . (2020) KELAYAKAN INSTALASI LISTRIK TEGANGAN RENDAH PADA BANGUNAN BERTINGKAT BERDASARKAN PUIL 2011 (Studi Kasus pada Bangunan Gudang dan Kantor J&T Gateway Rawa Bokor, Tangerang). Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (2MB)
[img] Text
BAB 1.pdf
Restricted to Repository staff only

Download (248kB)
[img] Text
BAB 2.pdf
Restricted to Repository staff only

Download (577kB)
[img] Text
BAB 3.pdf
Restricted to Repository staff only

Download (487kB)
[img] Text
BAB 4.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB 5.pdf
Restricted to Repository staff only

Download (237kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (237kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Penelitian ini bertujuan untuk mengetahui kelayakan melalui pemeriksaan dan pengukuran pada instalasi listrik pada bangunan gudang dan kantor terhadap Standar PUIL 2011. Objek penelitian adalah Gedung dan kantor J&T Gateway Rawa Bokor, Tangerang. Penelitian menggunakan metode penelitian kualitatif deskriptif melalui studi kasus. Pengambilan data dilakukan melalui Instrumen observasi yang diadopsi berdasarkan Peraturan Menteri Energi dan Sumber Daya Mineral No. 0045 Tahun 2005 tentang Instalasi Ketenagalistrikan lampiran VIII dengan 4 kategori yaitu: (1) Normal (A); (2) Observasi (B); (3) Minor (C) dan (4) Major (D). Pemeriksaan dan pengukuran instalasi pada aspek gambar instalasi, pengaman, penghantar, pemasangan, instalasi kamar mandi, dan kelengkapan instalasi listrik tersertfikasi Standar Nasional Indonesia. Hasil Penelitian menunjukkan: (1) gambar instalasi listrik dan diagram garis tunggal tidak lengkap; (2) komponen peralatan pengaman arus lebih dan pengaman sentuh tak langsug (pembumian) terpasang sesuai dengan standar PUIL 2011. Namun, komponen pengaman sentuh langsung dan bahaya kebakaran tidak terpasang diseluruh instalasi listrik; (3) ukuran penghantar sesuai standar PUIL 2011, setiap sirkit ukuran penghantar tidak melebihi kuat hantar arus yang mengalir pada kebutuhan instalasi yang disuplai. Penggunaan warna insulasi penghantar menggunakan standar PUIL 2000; (4) pemasangan komponen instalasi listrik sesuai standar PUIL 2011; (5) pada instalasi kamar tidak ada kotak kontak yang terpasang. Sakelar lampu tidak dilengkapi pengaman sentuh langsung; (6) kelengkapan instalasi yang terpasang seluruhnya sudah tersertifikasi Standar Nasional Indonesia. Kesimpulan hasil penelitian menunjukkan 73,95 % instalasi listrik bangunan gudang dan kantor J&T Gateway Rawa Bokor sesuai standar dengan klasifikasi “Instalasi layak operasi” dengan beberapa perbaikan disebabkan beberapa instalasi listrik tidak sesuai PUIL 2011. **************** This study aims to determine the feasibility of examining and measuring electrical installations in warehouse and office buildings against the 2011 PUIL Standard. The object of research is the building and office of J&T Gateway Rawa Bokor, Tangerang. A descriptive qualitative research methods is used in this research through case studies. Data retrieval is carried out through an observation instrument adopted under the Regulationof the Minister of Energy and Mineral Resources No. 0045 of 2005 concerning Electricity Installations, attachment VIII with 4 categories: (1) Normal (A); (2) Observation (B); (3) Minor (C) and (4) Major (D). Inspection and measurement of installations on the aspects of installation drawings, safety, conductors, installations, bathroom installations, and completeness of electrical installations certified to the Indonesian National Standard. The results shows: (1) incomplete electrical installation drawings and single line diagrams; (2) components of overcurrent protection equipment and indirect touch protection (earthing) are installed in accordance with PUIL 2011 standards. However, direct touch protection and fire hazard components are not installed in allelectrical installations; (3) the size of the conductor is in accordance with the 2011 PUIL standard, each circuit the size of the conductor does not exceed the current conductive strength that flows in the needs of the supplied installation. The use of the color of the conducting insulation uses the PUIL 2000 standard; (4) installation of electrical installation components according to the 2011 PUIL standard; (5) in the room installation there is no contact box installed. Light switches are not equipped with direct touch protection; (6) the completeness of the installation which has been fully installed is certified to the Indonesian National Standard.The conclusion of the research shows that 73.95% of the electrical installations for the warehouse and office buildings of J&T Gateway Rawa Bokor are in accordance with the classification of "Operation fit for operation" with some repairs due to some electrical installations not in accordance with PUIL 2011

Item Type: Thesis (Sarjana)
Subjects: Hukum > Hukum (Umum)
Teknologi dan Ilmu Terapan > Teknologi (umum)
Teknologi dan Ilmu Terapan > Teknologi (umum) > Teknologi Pendidikan
Teknologi dan Ilmu Terapan > Teknik Elektronika
Divisions: FT > S1 Pendidikan Teknik Elektro
Depositing User: Users 5286 not found.
Date Deposited: 16 Sep 2020 21:31
Last Modified: 16 Sep 2020 21:31
URI: http://repository.unj.ac.id/id/eprint/10435

Actions (login required)

View Item View Item