ANALISIS FAKTOR DOMINAN PENYEBAB KETERLAMBATAN PADA PEKERJAAN BEKISTING ALUMINIUM DI PROYEK SAKURA GARDEN CITY PHASE 1A JAKARTA TIMUR

ANGGI APRILIANY, . (2021) ANALISIS FAKTOR DOMINAN PENYEBAB KETERLAMBATAN PADA PEKERJAAN BEKISTING ALUMINIUM DI PROYEK SAKURA GARDEN CITY PHASE 1A JAKARTA TIMUR. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
BAB 1.pdf

Download (196kB)
[img] Text
BAB 2.pdf
Restricted to Registered users only

Download (688kB) | Request a copy
[img] Text
BAB 3.pdf
Restricted to Registered users only

Download (379kB) | Request a copy
[img] Text
BAB 4.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB 5.pdf
Restricted to Registered users only

Download (143kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (455kB)
[img] Text
COVER.pdf

Download (2MB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (3MB) | Request a copy

Abstract

*ABSTRAK* Di era modern seperti saat ini, pembangunan proyek gedung bertingkat di DKI Jakarta terus berkembang dengan cepat seperti apartement, gedung perkantoran, rumah susun, maupun pusat perbelanjaan yang memiliki metode konstruksi berbeda – beda. Metode konstruksi yang digunakan pembangunan gedung bertingkat pada pekerjaan bekisting untuk saat ini sudah lebih maju, salah satunya yaitu menggunakan metode bekisting aluminium. Pekerjaan bekisting alumunium di beberapa proyek gedung bertingkat pastinya memiliki kendala dalam proses pekerjaannya, sehingga mengakibatkan keterlambatan, salah satunya di Proyek Sakura Garden City, Jakarta Timur. Salah satu faktor penyebab keterlambatan tersebut adalah pada bagian pengiriman material dan kurangnya tenaga ahli pada pekerjaan tersebut. Hal tersebut dapat disebabkan oleh sikap remeh pihak pelaksana pada suatu pekerjaan proyek dan tidak menjadikannya sebagai bahan evaluasi. Oleh karena itu, tujuan dari penelitian ini adalah untuk mengetahui faktor yang paling berpengaruh sebagai penyebab keterlambatan pada pekerjaan bekisting aluminium. Metode penelitian yang digunakan yaitu deskriptif kuantitatif dengan pendekatan survei yang teknik pengumpulan datanya menggunakan penyebaran kuesioner, wawancara dan dokumentasi, serta dianalisis dengan bantuan software SPSS dan metode skoring bantuan Microsoft Excel. Wawancara dilakukan dengan 5 narasumber yang terlibat dalam pekerjaan bekisting alumunium dan dokumentasi dilakukan sebagai pelengkap data dari hasil penyebaran angket kuesioner di Proyek Sakura Garden City Phase 1A. Adapun hasil dari penelitian ini menunjukkan bahwa faktor-faktor penyebab keterlambatan pada pekerjaan bekisting aluminium adalah faktor tenaga kerja memiliki rata-rata scoring (bobot) sebesar 89%, faktor material pekerjaan memiliki rata-rata scoring (bobot) sebesar 88%, faktor keuangan memiliki rata-rata scoring (bobot) sebesar 87%, faktor peralatan pekerjaan memiliki rata-rata scoring (bobot) sebesar 86%, faktor karakteristik tempat memiliki rata-rata scoring (bobot) sebesar 85%, faktor manajerial memiliki rata-rata scoring (bobot) sebesar 83%, dan faktor eksternal pekerjaan memiliki rata-rata scoring (bobot) sebesar 79%. Sehingga, dapat disimpulkan bahwa faktor penyebab keterlambatan yang terjadi pada pekerjaan bekisting aluminium di Proyek Sakura, Jakarta Timur yaitu paling berpengaruh atau dominan adalah faktor tenaga kerja, sementara faktor yang paling tidak berpengaruh adalah faktor eksternal pekerjaan. *ABSTRACT* In this modern era, the constructions in DKI Jakarta continues to grow rapidly, especially in the construction of high-rise buildings can be apartments, office buildings, flats, or shopping centers that have different construction methods. The construction method used for the construction of high-rise buildings now has been more advanced, which is using the method of aluminum formwork. Aluminum formwork work in several high-rise building projects certainly has constraints in the process of work that can cause delays, which is at the Sakura Garden City Project, East Jakarta. One of the factors causing the delay is the delivery of materials and the lack of experts on the work. This can be caused by underestimate project work by taking it lightly on a project work and not making it as an evaluation material. Therefore, the purpose of this study is to find out the most influential factors as the cause of delays in the work of aluminum formwork. The research method used is descriptive quantitative with a survey approach with data collection techniques using questionnaires, interviews and documentation, as well as analysis with the help of SPSS software and scoring methods with the help of Microsoft Excel. Interviews were conducted with 5 resource persons involved in aluminum formwork work and documentation was carried out as a complement to data from the results of distributing questionnaires at the Sakura Garden City Phase 1A. The results of this study show that the factors causing delays in aluminum formwork work are Labor factors have an average scoring (weight) of 89%, Material factors of work have an average scoring (weight) of 88%, Financial factors have an average scoring (weight) of 87%, Equipment factors have an average scoring (weight) of 86%, Characteristic factors of the place have an average scoring (weight) of 85% , Managerial factors have an average scoring (weight) of 83%, and external factors of work have an average scoring (weight) of 79%. Thus, it can be concluded that the factors causing delays that occur in the work of aluminum formwork in the Sakura Project, East Jakarta are the most influential or dominant are labor factors, while the least influential factors are external factors of employment.

Item Type: Thesis (Sarjana)
Additional Information: 1) Dr. Irika Widiasanti, MT 2) Anisah, MT
Subjects: Teknologi dan Ilmu Terapan > Teknik Sipil
Divisions: FT > S1 Pendidikan Teknik Bangunan
Depositing User: Users 11828 not found.
Date Deposited: 01 Sep 2021 12:17
Last Modified: 25 Jul 2022 03:14
URI: http://repository.unj.ac.id/id/eprint/18432

Actions (login required)

View Item View Item