STUDI EVALUASI PADA ASPEK INFRASTRUKTUR BERBASIS CRL (CLUB LICENSING REGULATIONS) KLUB PERSIB BANDUNG

Widjayana Lukman, . (2022) STUDI EVALUASI PADA ASPEK INFRASTRUKTUR BERBASIS CRL (CLUB LICENSING REGULATIONS) KLUB PERSIB BANDUNG. Doktor thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER WM.pdf

Download (2MB)
[img] Text
BAB I WM.pdf

Download (603kB)
[img] Text
BAB II WM.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB III WM.pdf
Restricted to Registered users only

Download (494kB) | Request a copy
[img] Text
BAB IV WM.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB V WM.pdf
Restricted to Registered users only

Download (339kB) | Request a copy
[img] Text
DAFTAR PUSTAKA WM.pdf

Download (358kB)
[img] Text
LAMPIRAN DAN RIWAYAT HIDUP WM_compressed.pdf
Restricted to Registered users only

Download (2MB) | Request a copy

Abstract

Penelitian disertasi ini mengevaluasi aspek infrastruktur berdasarkan Club Licencing Regulation (CLR) pada Klub Persib Bandung (Persib) serta sejauh mana efektifitas keberhasilannya dalam peningkatan prestasi pada Klub Persib. Penelitian ini merupakan penelitian evaluatif dengan tinjauan Contex, Input, Process dan Product (CIPP). CIPP memiliki nilai relevansi karena pendekatan yang holistik dalam evaluasi dengan bertujuan memberikan gambaran yang sangat detail dan luas terhadap suatu program, mulai dari konteksnya hingga saat proses implementasi Evaluasi tahapan konteks meliputi tujuan dan sasaran, dasar hukum dan kebijakan, legalitas, penetapan susunan organisasi; tahapan input meliputi kelayakan stadion, kesediaan ruang kontrol, kapasitas, ketersediaan p3k, ruang kendali doping, spesifikasi lapangan, fasilitas pers dan media,dan akomondasi pendukung. Tahapan proses meliputi aturan dasar, prosedur pengoprasian/penggunaan, penggunaan fasilitas, perawatan, monitoring. Tahapan produk mengacu kepada kebugaran fisik, keterampilan atlet dan pencapaian prestasi klub berdasarkan hasil penelitian di dapat bahwa aspek Context hasil penilaian evaluasi sebesar 71,4% dengan kategori "baik", aspek Input sebesar 62,50% dengan kategori “cukup”, kategori Proses 60,00% kategori “cukup” dan Product sebesar 66,67% kategori "cukup". Hasil evaluasi secara keseluruhan aspek infrastruktur berdasarkan CLR Persib ialah 65,15% dengan kategori "cukup". Berdasarkan hasil evaluasi secara menyeluruh menyatakan bahwa dibutuhkan rancangan dalam sasaran, tujuan pengelolaan stadion dan menguraikan hal-hal yang memperlambat proses penjajakan, selain itu perlu melakukan lobiying untuk kewenangan pengelola stadion secara mandiri sehingga dapat lebih meningkatkan kebugaran fisik dan keterampilan pemain karena didukung infrastruktur yang lengkap dan canggih. This dissertation research evaluates the infrastructure aspects based on the Club Licensing Regulation (CLR) at the Persib Bandung Club (Persib) as well as the effectiveness of its success in improving the performance of the Persib Club. This research is an evaluative study with a context, input, process and product (CIPP) review. CIPP has relevance value because of its holistic approach in evaluation with the aim of providing a very detailed and broad picture of a program, starting from its context to the time of implementation. Evaluation of the context stage includes goals and objectives, legal and policy basis, legality, determination of organizational structure; input stages include stadium eligibility, availability of control rooms, capacity, availability of first aid, doping control rooms, field specifications, press and media facilities, and supporting accommodations. The stages of the process include basic rules, operating/use procedures, use of facilities, maintenance, monitoring. The product stages refer to physical fitness, athlete skills and club achievement. Based on the research results, it can be found that the Context aspect of the evaluation results is 71.4% in the "good" category, the Input aspect is 62.50% with the "enough" category, Process category 60.00% in the “enough” category and 66.67% in the Product category in the “enough” category. The results of the overall evaluation of infrastructure aspects based on Persib's CLR are 65.15% with the "enough" category. Based on the results of a comprehensive evaluation, it is stated that a design is needed in the goals, objectives of stadium management and describes things that slow down the assessment process, besides that it is necessary to lobby for the authority of the stadium manager independently so that it can further improve the physical fitness and skills of players because it is supported by a complete infrastructure. and sophisticated.

Item Type: Thesis (Doktor)
Additional Information: 1). Prof. Dr.Moch Asmawi, MPd 2). Prof. Dr.dr. James Tangkudung, SportMed.,MPd
Subjects: Olah Raga dan Seni Pertunjukan > Pendidikan Olah Raga
Divisions: PASCASARJANA > S2 Pendidikan Olahraga
Depositing User: Users 16265 not found.
Date Deposited: 08 Nov 2022 06:48
Last Modified: 08 Nov 2022 06:48
URI: http://repository.unj.ac.id/id/eprint/36184

Actions (login required)

View Item View Item