IDENTIFIKASI POTENSI BAHAYA DAN RESIKO KECELAKAAN KERJA PADA GUDANG KABEL DENGAN METODE HAZARD IDENTIFICATION , RISK ASSESSMENT AND RISK CONTROL (HIRARC) BERDASARKAN ISO 45001;2018

AZIZ CHAERUDIN ASHARI SIMATUPANG, . (2023) IDENTIFIKASI POTENSI BAHAYA DAN RESIKO KECELAKAAN KERJA PADA GUDANG KABEL DENGAN METODE HAZARD IDENTIFICATION , RISK ASSESSMENT AND RISK CONTROL (HIRARC) BERDASARKAN ISO 45001;2018. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (616kB)
[img] Text
BAB I.pdf

Download (531kB)
[img] Text
BAB II.pdf
Restricted to Registered users only

Download (460kB) | Request a copy
[img] Text
BAB III.pdf
Restricted to Registered users only

Download (230kB) | Request a copy
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (246kB) | Request a copy
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (190kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (309kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

Tujuan dari penelitian ini untuk mengidentifikasi bahaya dan resiko kecelakaan kerja pada gudang kabel yang akan dijadikan sebagai pedoman pada setiap aktifitas yang dilakukan. Selain itu, penelitian ini bertujuan untuk membantu pihak manajemen gudang dalam meningkatkan sistem manajemen K3 sesuai dengan standar yang ada Metode HIRARC (Hazard Identification and Risk Assessment Control) merupakan salah satu metode yang efektif terkait dengan identifikasi dan pengendalian risiko sebagai bagian dari upaya pencegahan cedera dan penyakit akibat kerja. Metode ini sebagai proses penentuan probabilitas dan konsekuensi dari peristiwa berbahaya yang diidentifikasi dan risikonya bagi pekerja Hasil identifikasi bahaya dengan menggunakan metode Hazard Identification , Risk Assesment , and Risk Control (HIRARC) pada pekerjaan bongkar-muat barang terdapat terdapat 2 aspek dengan 6 potensi bahaya kemudian terdapat 3 aspek dan 5 potensi bahaya pada pekerjaan bongkar haspel utuh dan terakhir terdapat 1 aspek dan 5 potensi bahaya pada pekerjaan pemotongan kabel. Hasil Penilaian Resiko dengan menggunakan metode Hazard Identification , Risk Assesment , and Risk Control (HIRARC) Pada penilaian resiko untuk pekerjaan bongkar-muat kabel bahaya tidak tepat meletakkan barang memiliki nilai tertinggi yaitu 12. Pada pekerjaan bongkar kabel utuh bahaya berupa serbuk kayu yang beterbangan dan paku yang ada mendapat nilai 12. Kemudian pekerjaan pemotongan kabel, pada pekerjaan ini ada 2 bahaya yang mendapat nilai tinggi yaitu pelat yang menonjol pada kabel dengan nilai 12 serta penggunaan mesin potong yang digunakan untuk memotong kabel berdiameter besar dengan nilai 16. ***** The purpose of this research is to identify the hazards and risks of work accidents in the cable warehouse which will be used as a guide for every activity carried out. In addition, this study aims to assist warehouse management in improving the K3 management system according to existing standards. The HIRARC (Hazard Identification and Risk Assessment Control) method is an effective method related to risk identification and control as part of efforts to prevent work-related injuries and illnesses. This method is the process of determining the probability and consequences of identified hazardous events and their risks to workers The results of hazard identification using the Hazard Identification, Risk Assessment, and Risk Control (HIRARC) method in the work of loading and unloading goods there are 2 aspects with 6 potential hazards then there are 3 aspects and 5 potential hazards in the work of loading and unloading goods intact and finally there is 1 aspect and 5 potential hazards in cable cutting work. The results of the risk assessment using the Hazard Identification, Risk Assessment, and Risk Control (HIRARC) method. In the risk assessment for cable loading and unloading work, the hazard of improperly placing goods has the highest value, namely 12. In intact cable unloading work, the danger is in the form of flying sawdust and the existing nails score 12. Then the cable cutting work, in this work there are 2 hazards that get high scores, namely the protruding plate on the cable with a value of 12 and the use of a cutting machine used to cut large diameter cables with a value of 16.

Item Type: Thesis (Sarjana)
Additional Information: 1). R. Eka Murtinugraha, M.Pd. ; 2). Drs. Arris Maulana, S.T., M.T.
Subjects: Teknologi dan Ilmu Terapan > Teknik Sipil
Divisions: FT > S1 Pendidikan Teknik Bangunan
Depositing User: Users 19826 not found.
Date Deposited: 06 Sep 2023 07:13
Last Modified: 06 Sep 2023 07:13
URI: http://repository.unj.ac.id/id/eprint/41419

Actions (login required)

View Item View Item