BUDI AFRIANI, . (2024) FEDERATED MODEL DAN PENJADWALAN DENGAN MENGIMPLEMENTASIKAN BUILDING INFORMATION MODELLING PADA BANGUNAN LABORATORIUM PUSAT UNGGULAN TEKNOLOGI (PUT) PNJ. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
COVER_ABSTRAK.pdf Download (807kB) |
|
Text
BAB 1 PENDAHULUAN.pdf Download (378kB) |
|
Text
BAB 2 LANDASAN TEORI.pdf Restricted to Registered users only Download (833kB) | Request a copy |
|
Text
BAB 3 METODOLOGI.pdf Restricted to Registered users only Download (752kB) | Request a copy |
|
Text
BAB 4 HASIL.pdf Restricted to Registered users only Download (6MB) | Request a copy |
|
Text
BAB 5 KESIMPULAN DAN SARAN.pdf Download (342kB) |
|
Text
LAMPIRAN DAN DAFTAR RIWAYAT HIDUP.pdf Restricted to Registered users only Download (4MB) | Request a copy |
Abstract
ABSTRAK Budi Afriani, Dr. Ir. Irika Widiasanti, M.T, Intan Puspa Wangi, M.T (2024) “Federated Model dan Penjadwalan Dengan Mengimplementasikan Building Information Modelling Pada Bangunan Laboratorium Pusat Unggulan Teknologi (PUT) PNJ”. Skripsi, Jakarta: Program Studi Teknologi Rekayasa Konstruksi Bangunan Gedung, Fakultas Teknik, Universitas Negeri Jakarta. Di Indonesia, penggunaan Building Information Modelling (BIM) masih sangat minim khususnya di bidang konstruksi gedung dan salah satunya pada bangunan Laboratorium Pusat Unggulan Teknologi (PUT) PNJ yang pada saat pelaksanaan konstruksi dilaksanakan belum menggunakan BIM dan terdapat clash pada elemen plumbing (pipa) antar struktur (balok) dan berpengaruh pada proses penjadwalan dan juga pada proses penjadwalan belum menggunakan metode BIM. Berdasarkan latar belakang tersebut, tujuan dari penelitian ini adalah menghasilkan produk federated model dari ketiga disiplin model (struktur, arsitektur dan MEP) dan juga penjadwalan serta visualisasinya. Metode yang digunakan dalam proses penelitian ini adalah metode 4D. Tahapan pertama yaitu melakukan analisis untuk proses pengembangan produk yang akan dibuat dan dilanjutkan dengan pemilihan software federated model dan penjadwalan yaitu menggunakan Autodesk Navisworks. Rencana federated model ini dilakukan mulai dari tahap pengumpulan data modelling 3D tiga disiplin, pembuatan data penjadwalan pada Microsoft Project dan diakhiri dengan menghubungkan hasil federated model dan data penjadwalan dari Microsoft Project. Hasil penelitian ini berupa visualisasi dan simulasi rencana penjadwalan. Hasil tersebut selanjutnya dilakukan proses validasi oleh pakar/ahli. Berdasarkan proses validasi, hasil produk dinyatakan layak digunakan. Total durasi penjadwalan menghasilkan 230 hari kerja. Kata kunci: Building Information Modelling, Federated Model, Metode 4D, disiplin model, penjadwalan. ***** ABSTRACT Budi Afriani, Dr. Ir. Irika Widiasanti,M.T, Intan Puspa Wangi, M.T (2024) "Federated Model and Schedulling by Implementing Building Information Modelling in the Laboratory Building of the PNJ Center for Excellence in Technology". Thesis, Jakarta: Building Construction Engineering Technology Study Program, Faculty of Engineering, State University of Jakarta. In Indonesia, the use of Building Information Modelling (BIM) is still very minimal, especially in the field of building construction and one of them is the PNJ Central Laboratory of Excellence in Technology (PUT) building which at the time of construction was carried out did not use BIM and there was a clash in the plumbing elements (pipes) between structures (beams) and affected the scheduling process and also in the scheduling process did not use the BIM method. Based on this background, the purpose of this study is to produce federated model products from the three model disciplines (structure, architecture and MEP) and also their scheduling and visualization. The method used in this research process is the 4D method. The first stage is to conduct an analysis for the product development process to be created and continue with the selection of federated model software and scheduling, namely using Autodesk Navisworks. This federated model plan is carried out starting from the three-discipline 3D modeling data collection stage, creating scheduling data in Microsoft Project and ending by connecting the results of the federated model and scheduling data from Microsoft Project. The results of this research are in the form of visualization and simulation of scheduling plans. The results are then validated by experts. Based on the validation process, the product results are declared suitable for use. The total scheduling duration results in 230 working days. Keyword: Building Information Modelling, Federated Model,4D Method, model discipline, scheduling.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Dr. Ir. Irika Widiasanti, M.T. ; 2). Intan Puspa Wangi, M.T. |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil |
Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
Depositing User: | Users 24923 not found. |
Date Deposited: | 07 Aug 2024 00:05 |
Last Modified: | 07 Aug 2024 00:05 |
URI: | http://repository.unj.ac.id/id/eprint/48926 |
Actions (login required)
View Item |