SWARASWATI KEMALA DEWI, . (2024) PENJADWALAN ULANG DENGAN METODE BUILDING INFORMATION MODELLING PADA GEDUNG BUSINESS CENTER PROYEK RESEARCH & TECHNOLOGY CENTER TERINTEGRASI PERTAMINA. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
COVER.pdf Download (2MB) |
|
Text
BAB 1.pdf Download (365kB) |
|
Text
BAB 2.pdf Restricted to Registered users only Download (572kB) | Request a copy |
|
Text
BAB 3.pdf Restricted to Registered users only Download (791kB) | Request a copy |
|
Text
BAB 4.pdf Restricted to Registered users only Download (3MB) | Request a copy |
|
Text
BAB 5.pdf Restricted to Registered users only Download (343kB) | Request a copy |
|
Text
DAFTAR PUSTAKA.pdf Download (347kB) |
|
Text
LAMPIRAN DAFTAR RIWAYAT HIDUP.pdf Restricted to Registered users only Download (4MB) | Request a copy |
Abstract
ABSTRAK Swaraswati Kemala Dewi, Lenggoggeni, M.T, Rezi Berliana Yasinta, M.T (2024).”Penjadwalan Ulang dengan Metode Building Information Modelling Pada Gedung Business Center Proyek Research & Technology Center Terintegrasi Pertamina” Skripsi. Jakarta : Program Studi Teknologi Rekayasa Konstruksi Bangunan Gedung, Fakultas Teknik, Universitas Negeri Jakarta. Salah satu permasalahan pada proyek konstruksi adalah kurang maksimalnya penggunaan teknologi dengan bentuk penyajian yang terbatas untuk memuat data proyek sehingga beberapa pekerjaan masih dilakukan dengan metode konvensional dan menyebabkan pekerjaan menjadi tidak efisien. Pada proyek Research & Technology Center Pertamina, penjadwalan belum menggunakan metode BIM dan sering terjadinya perubahan design. Akibatnya, dapat menghasilkan keterlambatan proyek. Berdasarkan latar belakang diatas, tujuan dari penelitian ini adalah menghasilkan produk berupa Rencana penjadwalan proyek pada gedung Business Center. Produk ini dibuat untuk memanfaatkan teknologi Building Information Modeling (BIM) sehingga tercapai kemudahan selama proses pemodelan rencana penjadwalan proyek yang lebih detail dan efisien dibandingan dengan metode konvensional. Penelitian ini menggunakan menggunakan metode Research and Development dengan model pengembangan 4D. Tahap pertama yaitu melakukan analisis untuk pengembangan produk yang akan dibuat, dilanjutkan dengan pemilihan software penjadwalan yang digunakan yaitu Autodesk Naviswork. Rencana penjadwalan ini dilakukan mulai dari tahap penggabungan model 3D, pembuatan data penjadwalan yang diaplikasikan menjadi Bill Off Quantity (BOQ), dan di akhiri dengan menghubungkan hasil modelling dan data penjadwalan. Hasil penelitian ini berupa visualisasi dalam simulasi rencana penjadwalan. Hasil tersebut selanjutnya divalidas oleh pakar/ahli. Hasil produk penjadwalan berdasarkan validasi pakar bahwa produk sudah valid dan dinyatakan layak digunakan. Durasi penjadwalan menghasilkan 220 hari kerja. ABSTRACT Swaraswati Kemala Dewi, Lenggoggeni, M.T, Rezi Berliana Yasinta, M.T (2024). "Rescheduling with Building Information Modeling Method in Business Center Building of Pertamina Integrated Research & Technology Center Project" Thesis. Jakarta: Building Construction Engineering Technology Study Program, Faculty of Engineering, State University of Jakarta. One of the problems in construction projects is the lack of maximum use of technology with a limited form of presentation to load project data so that some work is still done by conventional methods and causes work to be inefficient. In the Pertamina Research & Technology Center project, scheduling has not used the BIM method and frequent design changes occur. As a result, it can result in project delays. Based on the above background, the purpose of this research is to produce a product in the form of a project scheduling plan for the Business Center building. This product is made to utilize Building Information Modeling (BIM) technology to achieve convenience during the process of modeling project scheduling plans that are more detailed and efficient than conventional methods. This research uses the Research and Development method with the 4D development model. The first stage is to conduct an analysis for the development of the product to be made, followed by the selection of the scheduling software used, Autodesk Naviswork. This scheduling plan is carried out starting from the 3D model merging stage, making scheduling data that is applied to the Bill Off Quantity (BOQ), and ending with connecting the modeling results and scheduling data. The result of this research is a visualization in the simulation of the scheduling plan. These results are then validated by experts. The results of the scheduling product based on expert validation that the product is valid and declared feasible to use. The scheduling duration results in 220 working days.
Item Type: | Thesis (Sarjana) |
---|---|
Uncontrolled Keywords: | 1). Lenggoggeni, M.T, 2). Rezi Berliana Yasinta, M.T |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil |
Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
Depositing User: | Users 25083 not found. |
Date Deposited: | 07 Aug 2024 01:31 |
Last Modified: | 07 Aug 2024 01:31 |
URI: | http://repository.unj.ac.id/id/eprint/49033 |
Actions (login required)
View Item |