IMPLEMENTASI KONSTRUKSI DIGITAL BERBASIS BUILDING INFORMATION MODELING 6D (BIM 6D) PADA PROYEK GEDUNG OLAHRAGA UNIVERSITAS NEGERI JAKARTA

RICKY JOHANES SAPUTRA SIANIPAR, . (2024) IMPLEMENTASI KONSTRUKSI DIGITAL BERBASIS BUILDING INFORMATION MODELING 6D (BIM 6D) PADA PROYEK GEDUNG OLAHRAGA UNIVERSITAS NEGERI JAKARTA. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER - DAFTAR ISI.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (445kB)
[img] Text
BAB 2.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[img] Text
BAB 3.pdf
Restricted to Registered users only

Download (893kB) | Request a copy
[img] Text
BAB 4.pdf
Restricted to Registered users only

Download (6MB) | Request a copy
[img] Text
BAB 5.pdf
Restricted to Registered users only

Download (240kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (288kB)
[img] Text
LAMPIRAN-LAMPIRAN.pdf
Restricted to Registered users only

Download (5MB) | Request a copy

Abstract

ABSTRAK Ricky Johanes Saputra Sianipar, Irika Widiasanti, Erna Septiandini (2024) “Implementasi Konstruksi Digital Berbasis Building Information Modeling 6D (BIM 6D) Pada Proyek Gedung Olahraga Universitas Negeri Jakarta”. Skripsi, Jakarta: Program Studi Teknologi Rekayasa Konstruksi Bangunan Gedung, Fakultas Teknik, Universitas Negeri Jakarta. Efisiensi energi telah menjadi perhatian utama di industri konstruksi karena semakin meningkatnya kesadaran akan perlunya menjaga lingkungan dan mengurangi dampak perubahan iklim. Penerapan Building Information Modeling (BIM) sebagai alat untuk meningkatkan efisiensi energi pada tahap perencanaan konstruksi. Penelitian ini bertujuan untuk mengetahui faktor yang dapat mempengaruhi penggunaan energi dengan mengetahui nilai Intensitas Konsumsi Energi (IKE) pada Proyek Gedung Olahraga Universitas Negeri Jakarta, dan mengetahui dampak penerapan Building Information Modeling (BIM). Metode yang digunakan dalam proses penelitian ini adalah metode 4D (Define, Design, Development, Disseminate). Dari hasil simulasi menggunakan software Autodesk Revit dan Autodesk Insight, didapatkan nilai Intensitas Konsumsi Energi (IKE) sebesar 320 kWh/m2/tahun. Faktor yang dilakukan untuk melakukan penghematan energi yaitu dengan Efisiensi Pencahayaan menggunakan 7,53 W/m2, Pencahayaan Alami dan Kontrol Hunian, HVAC menggunakan ASHRAE Package Terminal Heat Pump, Efisiensi Beban Steker, dan Jadwal Operasi Gedung. Faktor tersebut dapat menghasilkan penghematan sebesar 31.25% dengan nilai IKE sebesar 220 kWh/m2/tahun. Berdasarkan hasil simulasi analisis energi yang dilakukan dengan menggunakan Building Information Modeling (BIM) didapatkan 15 faktor yang mempengaruhi penggunaan energi pada proyek Gedung Olahraga Universitas Negeri Jakarta. Dari hasil simulasi perhitungan nilai IKE menggunakan software berbasis BIM didapatkan nilai IKE sebesar 320 kWh/m2/tahun atau 26,667 kWh/m2/bln. Dampak penerapan BIM 6D yaitu koordinasi, kolaborasi, peningkatan efisiensi konstruksi, operasional dan pemeliharaan serta keberlanjutan. Kata kunci: Building Information Modeling 6D, Analisis Energi, Metode 4D, Keberlanjutan, IKE ***** ABSTRACT Ricky Johanes Saputra Sianipar, Irika Widiasanti, Erna Septiandini (2024) "Implementation of Digital Construction Based on Building Information Modeling 6D (BIM 6D) in the Sports Building Project of the State University of Jakarta". Thesis, Jakarta: Building Construction Engineering Technology Study Program, Faculty of Engineering, State University of Jakarta. Energy efficiency has become a major concern in the construction industry due to the growing awareness of the need to protect the environment and reduce the impact of climate change. The implementation of Building Information Modeling (BIM) as a tool to improve energy efficiency in the construction planning stage is crucial. This research aims to identify factors that can affect energy use by determining the Energy Consumption Intensity (ECI) value in the State University of Jakarta Sports Center Project and to understand the impact of implementing Building Information Modeling (BIM). The method used in this research process is the 4D method (Define, Design, Development, Disseminate). From the results of the simulation using Autodesk Revit and Autodesk Insight software, an Energy Consumption Intensity (ECI) value of 320 kWh/m2/year was obtained. The factors implemented to achieve energy savings include: Lighting Efficiency using 7.53 W/m2, Natural Lighting and Occupancy Control, HVAC using ASHRAE Package Terminal Heat Pump, Plug Load Efficiency, and Building Operation Schedule. These factors can result in energy savings of 31.25% with an ECI value of 220 kWh/m2/year. Based on the results of the energy analysis simulation conducted using Building Information Modeling (BIM), 15 factors were identified that affect energy use in the State University of Jakarta Sports Center Project. From the results of the ECI value calculation simulation using BIM-based software, an ECI value of 320 kWh/m2/year or 26.667 kWh/m2/month was obtained. The impacts of implementing 6D BIM are coordination, collaboration, improved construction efficiency, operations and maintenance, and sustainability. Keywords: Building Information Modeling 6D, Energy Analysis, 4D Method, Sustainability, IKE

Item Type: Thesis (Sarjana)
Additional Information: 1). Dr. Ir. Irika Widiasanti, M.T. ; 2). Ir. Erna Septiandini, M.T.
Subjects: Teknologi dan Ilmu Terapan > Teknik Sipil
Teknologi dan Ilmu Terapan > Teknik Lingkungan, Teknik Sanitasi
Teknologi dan Ilmu Terapan > Teknik Jembatan
Teknologi dan Ilmu Terapan > Konstruksi Bangunan
Divisions: FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung
Depositing User: Users 25073 not found.
Date Deposited: 09 Aug 2024 00:58
Last Modified: 09 Aug 2024 00:58
URI: http://repository.unj.ac.id/id/eprint/49292

Actions (login required)

View Item View Item