DIFANGGA PRASETYO AJI, . (2024) IDENTIFIKASI KETERLAMBATAN PEKERJAAN KAYU PADA PROYEK PASAR IKAN LUAR BATANG HEXAGON JAKARTA UTARA. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
COVER.pdf Download (902kB) |
|
Text
BAB I.pdf Download (733kB) |
|
Text
BAB II.pdf Restricted to Registered users only Download (689kB) | Request a copy |
|
Text
BAB III.pdf Restricted to Registered users only Download (560kB) | Request a copy |
|
Text
BAB IV.pdf Restricted to Registered users only Download (466kB) | Request a copy |
|
Text
BAB V.pdf Restricted to Registered users only Download (291kB) | Request a copy |
|
Text
DAFTAR PUSTAKA.pdf Download (309kB) |
|
Text
LAMPIRAN .pdf Restricted to Registered users only Download (1MB) | Request a copy |
Abstract
Keterlambatan pelaksanaan proyek umumnya menimbulkan dampak yang merugikan baik bagi pemilik maupun kontraktor, karena dampak keterlambatan adalah konflik dan perdebatan tentang penyebab serta tuntutan waktu pelaksanaan proyek. Salah satu proyek yang menggunakan bahan material kayu adalah Proyek Pasar Ikan Luar Batang Hexagon Jakarta Utara yang merupakan proyek dari Pemerintah Daerah (Pemda) DKI Jakarta dalam upaya mempertahankan Cagar Budaya. Namun, dalam pelaksanaan pekerjaan kayu pada proyek ini mengalami keterlambatan yang disebabkan oleh beberapa faktor seperti faktor kontrak, material/peralatan, tenaga kerja, kondisi alam, pemilik proyek, dan pelaksana proyek. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor dominan apa saja yang menyebabkan keterlambatan proyek Pasar Ikan Luar Batang Hexagon Jakarta Utara. Hasil penelitian diharapkan dapat memberikan manfaat bagi para kontraktor sebagai bahan pertimbangan dan pembelajaran untuk memanajemen pekerjaan kayu dalam konstruksi bangunan agar bisa tepat sasaran sesuai jadwal pelaksanaan yang telah direncanakan pada awal kontrak. Metode pengambilan data menggunakan kuesioner dengan analisa penelitian yang digunakan yaitu dengan metode deskriptif kuantitatif. Hasil penelitian berdasarkan indikator penilaian pada kuesioner menunjukkan, didapatkan hasil analisa perolehan faktor utama penyebab keterlambatan Proyek Pasar Ikan Luar Batang Hexagon Jakarta Utara yaitu Faktor Kontrak yang memiliki nilai rata-rata 73,81% dan juga Faktor Kondisi Alam dengan nilai rata-rata 72,38%. Kata Kunci : Keterlambatan, Proyek, Pekerjaan Kayu Delays in project implementation generally have a detrimental impact on both the owner and contractor, because the impact of delays is conflict and debate about the causes and time demands for project implementation. One of the projects that uses wooden materials is the North Jakarta Batang Hexagon Outdoor Fish Market Project, which is a project of the DKI Jakarta Regional Government (Pemda) in an effort to maintain cultural heritage. However, the implementation of wood work on this project experienced delays caused by several factors such as contract factors, material/equipment, labor, natural conditions, project owner and project implementer. This research aims to identify the dominant factors that cause delays in the North Jakarta Batang Hexagon Luar Fish Market project. It is hoped that the results of the research will provide benefits for contractors as material for consideration and learning for managing wood work in building construction so that it can be on target according to the implementation schedule planned at the beginning of the contract. The data collection method uses a questionnaire with research analysis used, namely the quantitative descriptive method. The results of the research based on the assessment indicators in the questionnaire showed that the results of the analysis obtained the main factors causing delays in the North Jakarta Batang Hexagon Outdoor Fish Market Project, namely the Contract Factor which had an average value of 73.81% and also the Natural Condition Factor with an average value of 72. 38%. Keywords: Delays, Projects, Wood Works
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Anisah, M.T. ; 2). Drs. Arris Maulana, S.T., M.T. |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil |
Divisions: | FT > S1 Pendidikan Teknik Bangunan |
Depositing User: | Users 25022 not found. |
Date Deposited: | 09 Aug 2024 05:37 |
Last Modified: | 09 Aug 2024 05:37 |
URI: | http://repository.unj.ac.id/id/eprint/49616 |
Actions (login required)
View Item |