ABDULLAH AZZAM, . (2025) IMPLEMENTASI BUILDING INFORMATION MODELING (BIM) 3D UNTUK PERHITUNGAN ESTIMASI BIAYA PADA TAHAP KONSTRUKSI (STUDI KASUS: PROYEK SDN 03 BALEKAMBANG ). Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
![]() |
Text
Cover.pdf Download (1MB) |
![]() |
Text
Bab 1.pdf Download (753kB) |
![]() |
Text
Bab 2.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text
Bab 3.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text
Bab 4.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text
Bab 5.pdf Restricted to Registered users only Download (623kB) |
![]() |
Text
Daftar Pustaka.pdf Download (625kB) |
![]() |
Text
Lampiran.pdf Restricted to Registered users only Download (1MB) |
Abstract
Permasalahan yang sering terjadi pada tahap konstruksi adalah perubahan desain yang berdampak pada ketidaksesuaian volume pekerjaan antara rencana awal dengan kondisi aktual di lapangan. Hal ini dapat menyebabkan pemborosan biaya dan waktu. Penelitian ini bertujuan untuk mengimplementasikan Building Information Modeling (BIM) 3D sebagai alat bantu dalam melakukan perhitungan ulang volume pekerjaan secara akurat dan efisien pada proyek rehabilitasi total SDN 03 Balekambang. Metode yang digunakan adalah Research and Development (R&D) dengan pendekatan model pengembangan 4D (Define, Design, Develop, Disseminate). Proses dilakukan melalui pemodelan elemen struktur, arsitektur, dan MEP dengan menggunakan software Autodesk Revit 2025, dilanjutkan dengan visualisasi model pada Autodesk Viewer dan perhitungan volume pekerjaan melalui fitur Quantity Take Off. Diharapkan dari hasil penelitian ini, BIM dapat meningkatkan efisiensi perhitungan volume, memperkecil risiko kesalahan akibat perubahan desain, serta menjadi acuan penerapan BIM pada proyek fasilitas publik secara lebih luas. ***** A common issue during the construction phase is design changes that lead to discrepancies between planned and actual work volumes, often resulting in cost and time overruns. This study aims to implement 3D Building Information Modeling (BIM) as a tool to support accurate and efficient recalculation of work volumes in the total rehabilitation project of SDN 03 Balekambang. The research method used is Research and Development (R&D) with a 4D development model approach (Define, Design, Develop, Disseminate). The process involves modeling structural, architectural, and MEP elements using Autodesk Revit 2024, visualizing the model through Autodesk Viewer, and calculating work volumes via the Quantity Take Off feature. The results are expected to improve the efficiency of volume calculations, reduce errors due to design changes, and serve as a reference for broader implementation of BIM in public facility projects.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Lenggogeni, M.T. ; 2). Rezi Berliana Yasint, M.T. |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil Teknologi dan Ilmu Terapan > Konstruksi Bangunan |
Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
Depositing User: | Abdullah Azzam . |
Date Deposited: | 08 Aug 2025 06:08 |
Last Modified: | 08 Aug 2025 06:08 |
URI: | http://repository.unj.ac.id/id/eprint/59148 |
Actions (login required)
![]() |
View Item |