ALIF RIZKY FAKHREZIE, . (2021) PERENCANAAN DISTRIBUSI AIR BERSIH DI DESA BATULAYANG KECAMATAN CISARUA KABUPATEN BOGOR. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
COVER.pdf Download (2MB) |
|
Text
BAB 1.pdf Download (693kB) |
|
Text
BAB 2.pdf Restricted to Registered users only Download (3MB) | Request a copy |
|
Text
BAB 3.pdf Restricted to Registered users only Download (911kB) | Request a copy |
|
Text
BAB 4.pdf Restricted to Registered users only Download (2MB) | Request a copy |
|
Text
BAB 5.pdf Restricted to Registered users only Download (236kB) | Request a copy |
|
Text
DAFTAR PUSTAKA.pdf Download (560kB) |
|
Text
LAMPIRAN.pdf Restricted to Registered users only Download (3MB) | Request a copy |
Abstract
Air merupakan sumber kehidupan bagi seluruh makhluk hidup di Bumi termasuk manusia. Manusia bisa bertahan hidup tanpa air hanya 4 hingga 5 hari saja. Kebutuhan air di RW. 2 Desa Batulayang semakin meningkat namun justru ketersediaannya semakin menurun. Ini membuat penduduk RW. 2 Desa Batulayang kesulitan melakukan aktivitas aktivitasnya. Penelitian ini bertujuan untuk merencanakan sistem pemenuhan kebutuhan air bersih penduduk RW. 2 Desa Batulayang dengan membuat sistem distribusi air bersih dari sumber air baru yaitu aliran Air Terjun Kembar yang berada 2 kilometer dari wilayah RW. 2 Desa Batulayang. Penelitian ini mengukur kualitas fisik dan kuantitas dari aliran Air Terjun Kembar serta menganalisa kebutuhan air bersih penduduk RW. 2 Desa Batulayang melalui proyeksi jumlah penduduk dan proyeksi kebutuhan air bersih selama 10 tahun kedepan yaitu dari 2020 hingga 2030. Dari hasil pengukuran dan proyeksi tersebut dilakukan perencanaan sistem distribusi air bersih dengan menggunakan program EPANET 2.0 yang nantinya akan digunakan sebagai solusi atas permasalahan air bersih di RW. 2 Desa Batulayang. Berdasarkan hasil pengolahan data dan pengamatan langsung di lapangan, debit aliran Air Terjun Kembar adalah 163,2 lt/dtk dan mampu memenuhi kebutuhan air penduduk RW. 2 Desa Batulayang yang hanya sebesar 1,980 lt/dtk di tahun 2020 dan 2,224 lt/dtk ditahun 2030. Setelah dilakukan analisa dan simulasi EPANET 2.0 didapatkan jumlah kebutuhan pipa adalah 830 batang; Ø144mm sebanyak 517 batang, Ø76mm sebanyak 177 batang, Ø60mm sebanyak 28 batang, dan Ø42mm sebanyak 108 batang. Water is the source of life for all living things on Earth, including humans. Humans can survive without water for only 4 to 5 days. Water needs in RW. 2 Desa Batulayang is increasing but its availability is decreasing. This keeps residents of the RW. 2 Desa Batulayang has difficulty carrying out its activities. This study aims to plan a system for meeting the clean water needs of residents of RW. 2 Desa Batulayang by making a clean water distribution system from a new water source, namely the flow of Kembar Waterfall which is 2 kilometers from the RW. 2 area Batulayang Village. This study measures the quality and quantity of the Kembar Waterfall’s flow and analyzes the clean water needs of the RW. 2 resident. Desa Batulayang through projected population and projection of clean water needs for the next 10 years, from 2020 to 2030. From the measurement and projection results, a clean water distribution system planning was carried out using the EPANET 2.0 program which would later be used as a solution to clean water problems in RWs. 2 Batulayang Village. Based on the results of data processing and direct observation in the field, the flow rate of Kembar Waterfall is 163.2 l / sec and is able to meet the water needs of the residents RW. 2 Desa Batulayang, which is only 1,980 l / s in 2020 and 2,224 l / s in 2030. 4. After analyzing and simulating EPANET 2.0, it is found that the number of pipe needs is 830; 517 Ø144mm, 177 Ø76mm, 28 Ø60mm and 108 Ø42mm.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Prof. Dr. Henita Rahmayanti, M. Si. ; 2). Drs. Arris Maulana, M.T. |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Hidraulik, Pelabuhan, Irigasi |
Divisions: | FT > S1 Pendidikan Teknik Bangunan |
Depositing User: | Users 9982 not found. |
Date Deposited: | 04 Mar 2021 08:54 |
Last Modified: | 10 Mar 2021 07:32 |
URI: | http://repository.unj.ac.id/id/eprint/14253 |
Actions (login required)
View Item |