PERENCANAAN INSTALASI AIR KOTOR DAN TANGKI SEPTIK KOMUNAL (Studi Kasus di Wilayah Pertanian Selatan RT 004 RW 003 Kelurahan Klender Kecamatan Duren Sawit Jakarta Timur)

FITRI FAUZIAH RAHMAH, . (2015) PERENCANAAN INSTALASI AIR KOTOR DAN TANGKI SEPTIK KOMUNAL (Studi Kasus di Wilayah Pertanian Selatan RT 004 RW 003 Kelurahan Klender Kecamatan Duren Sawit Jakarta Timur). Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
SKRIPSI .pdf

Download (10MB)

Abstract

Penelitian ini bertujuan untuk melakukan perencanaan instalasi air kotor dan tangki septik komunal berikut dengan saluran drainase. Perencanaan ini diupayakan sebagai solusi dalam permasalahan pencemaran lingkungan akibat tidak efektifnya instalasi air kotor yang mengakibatkan tersumbatnya instalasi air kotor dan terjadi genangan pada saluran drainase. Perencanaan dilakukan dengan observasi lapangan, studi kepustakaan, serta mengikuti pedoman yang terkait dengan sistem plambing dan saluran drainase dari Departemen Pekerjaan Umum dan Standar Nasional Indonesia (SNI). Tempat perencanaan ini di Wilayah Pertanian Selatan RT 004 RW 003 Kelurahan Klender Kecamatan Duren Sawit Jakarta Timur. Dalam perencanaan ini dilakukan untuk mengetahui jumlah kebutuhan, lokasi penempatan, desain saluran drainase, dan anggaran biaya. Hasil perencanaan yang telah dilakukan dapat mewujudkan lingkungan yang baik dan nyaman. Pipa yang digunakan didalam rumah untuk air buangan sebesar 4 inch, air kotor menggunakan pipa sebesar 5 inch dan pipa ven menggunakan pipa 21/2 inch. Untuk pipa induk yang menerima air kotor dari rumah menggunakan pipa sebesar 6 inch. Tangki septik yang digunakan adalah Septictank Biotech Horizontal dengan menggunakan sistem biofiter dan klorinasi sehingga hasil dari proses tersebut adalah air jernih yang tidak mencemari lingkungan. Desain saluran drainase debit banjir rencana (Qr) menggunakan metode rasional dengan periode ulang 2 tahunan didapat sebesar 0,0733 m3/dtk. Kapasitas daya tampung saluran (Qs) dari perhitungan didapat sebesar 0,102 m3 /dtk sehingga Qr < Qs. Desain saluran drainase menggunakan beton precast berbentuk trapesium dengan ukuran lebar atas 0,5 m, lebar bawah 0,3 m dan tinggi 0,5 m. Penutup beton berbentuk persegi dengan ukuran panjang 0,5 m, lebar 0,5 m dan tebal 0,005 m. Anggaran biaya yang dibutuhkan dalam perencanaan instalasi air kotor dan tangki septik adalah sebesar Rp. 330,258,333. *This study aims to do the planning of dirty water installation and a communal septic tank including the drainage channels. The design is pursued as a solution in a problem of environmental pollution due to the ineffectiveness of the installation of the dirty water resulting to the blockage of the installation pool of dirty water and made the puddles occur in drainage channels. The design is done by some of methods such as observation, literature study, and study of the guidelines related to the plumbing system and the drainage channels from the Department of Public Works and the Indonesian National Standard (SNI). The design is located in KampungPertanian Selatan RT 004 RW 003 Klender Region, District of Duren Sawit, East Jakarta. This Design is done to determine the number of requirements, placement location, the design of drainage channels, and budgeting process. The results of the planning that has been done can result a good and comfortable environment. A 4 inch Pipes is used in the home for waste water, while the 5 inch is used for dirty water and for the pipe ven is using 21/2 inch pipe. For the main pipe that receives sewage from homes uses a 6 inch pipe. The type of Septic tanks used is the Biotech Horizontal septictank which is using biofiter and chlorination system to outcome the process of clear water that does not pollute the environment. The design of the drainage channel flood discharge plan (Qr) using rational method with an annual return period 2. The result obtained is 0.073 m3 /sec. The capacity of the channel capacity (Qs) from the calculation obtained by 0.102 m3 / sec so Qr<Qs. The drainage design is using a trapezium precast concrete with size of 0.5 m of upper width, 0.3 m of the bottom width, and a height of 0.5 m. The casing cover is using a square with a 0.5 m length, 0.5 m width and a thickness of 0.005 m. The budget costs involved in the installation of sewage and septic tank is Rp. 330,258,333

Item Type: Thesis (Sarjana)
Additional Information: 1). Drs. Arris Maulana, MT ; 2). Drs. Doddy Rochadi, M.Pd
Subjects: Teknologi dan Ilmu Terapan > Konstruksi Bangunan
Divisions: FT > S1 Pendidikan Teknik Bangunan
Depositing User: Users 8922 not found.
Date Deposited: 26 Apr 2022 03:32
Last Modified: 26 Apr 2022 03:32
URI: http://repository.unj.ac.id/id/eprint/27503

Actions (login required)

View Item View Item