ANALISIS PENGELOLAAN LIMBAH KONSTRUKSI PADA PEKERJAAN KONSTRUKSI GEDUNG BERTINGKAT (STUDI KASUS PADA REVITALISASI RUSUN CIPINANG BESAR UTARA JAKARTA TIMUR)

MOHAMMAD MINAN BASHORI RIDWAN, . (2022) ANALISIS PENGELOLAAN LIMBAH KONSTRUKSI PADA PEKERJAAN KONSTRUKSI GEDUNG BERTINGKAT (STUDI KASUS PADA REVITALISASI RUSUN CIPINANG BESAR UTARA JAKARTA TIMUR). Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (245kB)
[img] Text
BAB 2.pdf
Restricted to Registered users only

Download (585kB) | Request a copy
[img] Text
BAB 3.pdf
Restricted to Registered users only

Download (385kB) | Request a copy
[img] Text
BAB 4.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB 5.pdf
Restricted to Registered users only

Download (233kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (187kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (753kB) | Request a copy

Abstract

Penelitian ini bertujuan untuk mengetahui komposisi jenis material, sumber dan penyebab terjadinya limbah konstruksi serta pengelolaan limbah konstruksi. Tempat penelitian ini dilakukan pada Revitalisasi Rusun Cipinang Besar Utara. berlokasi di Jl. Cipinang Pulo, Kelurahan Cipinang Besar Utara, Kecamatan Jatinegara, Jakarta Timur. Penelitian ini dilaksanakan pada bulan Desember 2021 - Februari 2022. Metode penelitian yang digunakan dalam penelitian ini menggunakan Kualitatif deskriptif dengan metode survei. Teknik pengumpulan data menggunakan wawancara, observasi dan dokumentasi. Berdasarkan hasil penelitian, dapat disimpulkan bahwa komposisi limbah konstruksi meliputi Kayu, multipleks, besi tulangan, kawat bendrat, sisa beton ready mix, sisa puing beton, dan material lainnya seperti kabel dan sampah plastik. Sumber Limbah yaitu Pekerjaan Struktur Atas (kolom, balok, plat lantai dan tangga). Penyebab limbah konstruksi meliputi pada saat perakitan pembesian (sisa pemotongan besi), pemasangan dan pembongkaaran bekisting, sisa pengecoran, perubahan desain, kurangnya keterampilan dan pemahaman pekerja dalam penanganan material, kesahalan dalam manajemen, kurangnya pengawasan dan cuaca hujan. Kemudian dari hasil perhitungan kuantitas material, sisa material yang banyak menjadi limbah konstruksi terdapat pada material besi dengan jumlah sisa material sebesar 2278.3 Kg. sedangkan untuk sisa material kayu menghasilkan limbah konstruksi sebesar 11 m3 dan multripleks menghasilkan sisa limbah sebesar 23.75 m2. Pengelolaan limbah konstruksi dengan cara reduction, reuse dan recycling. ***** Building Engineering Education Study Program, Faculty of Engineering, State University of Jakarta. This study aims to determine the composition of material types, sources and causes of construction waste and construction waste management. The place of this research was carried out at the Revitalization of the Cipinang Besar Utara Flats. located on Jl. Cipinang Pulo, Cipinang Besar Utara Village, Jatinegara District, East Jakarta. This research was conducted in December 2021 - February 2022. The research method used in this study was descriptive qualitative with survey method. Data collection techniques using interviews, observation and documentation. Based on the results of the study, it can be concluded that the composition of construction waste includes wood, multiplex, reinforcing steel, bendrat wire, ready mix concrete residue, remaining concrete debris, and other materials such as cables and plastic waste. Sources of Waste are Upper Structural Works (columns, beams, floor plates and stairs). The causes of construction waste include the time of assembling iron (remaining iron cutting), installation and dismantling of formwork, casting residue, design changes, lack of skills and understanding of workers in material handling, management errors, lack of supervision and rainy weather. Then from the results of the calculation of the quantity of material, the remaining material that is a lot of construction waste is found in iron material with the amount of remaining material amounting to 2278.3 Kg. while for the rest of the wood material it produces 11 m3 of construction waste and multiplex produces 23.75 m2 of residual waste. Management of construction waste by means of reduction, reuse and recycling.

Item Type: Thesis (Sarjana)
Additional Information: 1). Drs. Arris Maulana, S.T., M.T. ; 2). Dra. Rosmawita Saleh, M.Pd.
Subjects: Teknologi dan Ilmu Terapan > Teknik Lingkungan, Teknik Sanitasi
Divisions: FT > S1 Pendidikan Teknik Bangunan
Depositing User: Users 15969 not found.
Date Deposited: 06 Sep 2022 00:43
Last Modified: 06 Sep 2022 00:43
URI: http://repository.unj.ac.id/id/eprint/34848

Actions (login required)

View Item View Item