NADIA SEFTIANI, . (2024) IMPLEMENTASI BUILDING INFORMATION MODELLING PADA PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING STUDI KASUS : BANGUNAN LABORATORIUM PUSAT UNGGULAN TEKNOLOGI (PUT) PNJ. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
COVER.pdf Download (829kB) |
|
Text
BAB 1.pdf Download (249kB) |
|
Text
BAB 2.pdf Restricted to Registered users only Download (907kB) | Request a copy |
|
Text
BAB 3.pdf Restricted to Registered users only Download (570kB) | Request a copy |
|
Text
BAB 4.pdf Restricted to Registered users only Download (3MB) | Request a copy |
|
Text
BAB 5.pdf Restricted to Registered users only Download (179kB) | Request a copy |
|
Text
DAFTAR PUSTAKA.pdf Download (310kB) |
|
Text
LAMPIRAN DAN DAFTAR RIWAYAT HIDUP.pdf Restricted to Registered users only Download (3MB) | Request a copy |
Abstract
ABSTRAK Penerapan Building Information Modelling (BIM) di Indonesia terus berkembang seiring dengan meningkatnya kesadaran akan pentingnya teknologi ini dalam sektor konstruksi dan infrastruktur. BIM memiliki berbagai fungsi yang sangat bermanfaat dalam proses perencanaan, desain, konstruksi, dan manajemen bangunan, sehingga tidak diterapkannya BIM dalam proyek konstruksi dapat mengakibatkan berbagai masalah serius, seperti kurangnya koordinasi antar disiplin elemen yang berujung pada konflik desain, serta peningkatan risiko kesalahan konstruksi yang mahal dan memakan waktu untuk diperbaiki, seperti salah satunya pada bangunan Laboratorium Pusat Unggulan Teknologi (PUT) Politeknik Negeri Jakarta yang pada saat perencanaan konstruksi tidak menerapkan BIM sehingga menyebabkan terjadinya konflik desain. Tujuan penelitian ini adalah untuk membuat produk pemodelan 3D MEP serta melakukan perhitungan estimasi biaya dan visualisasi dengan penerapan BIM sebagai upaya untuk membantu pengembangan BIM pada bangunan tersebut. Metode yang digunakan dalam proses penelitian ini adalah metode 4D (Define, Design, Development, Desseminate). Penelitian ini menghasilkan produk pemodelan 3D MEP yang detail untuk bangunan Laboratorium Pusat Unggulan Teknologi (PUT) PNJ, model ini mencakup visualisasi semua sistem mekanikal, elektrikal, dan plumbing, yang diintegrasikan dalam satu platform BIM. Selanjutnya yaitu produk perhitungan estimasi biaya pada pekerjaan MEP dengan penerapan BIM dan menghasilkan estimasi biaya sebesar Rp. 5.988.889.931,15. Berdasarkan hasil uji kelayakan yang telah dilakukan, validator menyatakan bahwa produk yang dikembangkan memenuhi kriteria dan sesuai dengan kebutuhan penggunaan. Dari hasil tersebut, dapat disimpulkan bahwa penerapan BIM pada tahap konstruksi bangunan sangat diperlukan untuk menghindari terjadinya konflik desain dan kesalahan konstruksi lainnya. ABSTRACT The implementation of Building Information Modelling (BIM) in Indonesia continues to develop in line with the increasing awareness of the importance of this technology in the construction and infrastructure sectors. BIM has various functions that are highly beneficial in the planning, design, construction, and management processes of buildings. The absence of BIM implementation in construction projects can lead to serious issues, such as a lack of coordination among the discipline elements, resulting in design conflicts and increased risk of costly and time-consuming construction errors. An example of this is the Pusat Unggulan Teknologi (PUT) Laboratory building at Politeknik Negeri Jakarta, where the lack of BIM implementation during the construction planning phase caused design conflicts. This study aims to create a 3D MEP modeling product and perform cost estimation and visualization using BIM to assist in the development of BIM for the building. The method used in this research process is the 4D method (Define, Design, Development, Disseminate). This research produces a detailed 3D MEP modeling product for the PUT Laboratory building at PNJ, which includes the visualization of all mechanical, electrical, and plumbing systems integrated into a single BIM platform. Furthermore, it provides a cost estimation product for the MEP work using BIM, resulting in a cost estimate of IDR 5,988,889,931.15. Based on the feasibility tests conducted, the validators stated that the developed product meets the criteria and is suitable for use. From these results, it can be concluded that the implementation of BIM in the construction phase of buildings is essential to avoid design conflicts and other construction errors.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Dr. Ir. Irika Widiasanti, M.T 2). Intan Puspa Wangi, M.T |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil |
Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
Depositing User: | Users 24852 not found. |
Date Deposited: | 07 Aug 2024 05:57 |
Last Modified: | 07 Aug 2024 05:57 |
URI: | http://repository.unj.ac.id/id/eprint/49168 |
Actions (login required)
View Item |