ELVINA ALODIA RAMANDHANI, . (2025) IMPLEMENTASI TEKNOLOGI BUILDING INFORMATION MODELLING (BIM) 4D DALAM PENJADWALAN ULANG PROYEK REHABILITASI TOTAL SDN 03 BALEKAMBANG. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
![]() |
Text
COVER.pdf Download (623kB) |
![]() |
Text
BAB I.pdf Download (300kB) |
![]() |
Text
BAB II.pdf Restricted to Registered users only Download (1MB) | Request a copy |
![]() |
Text
BAB III.pdf Restricted to Registered users only Download (585kB) | Request a copy |
![]() |
Text
BAB IV.pdf Restricted to Registered users only Download (1MB) | Request a copy |
![]() |
Text
BAB V.pdf Restricted to Registered users only Download (263kB) | Request a copy |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (271kB) |
![]() |
Text
LAMPIRAN.pdf Restricted to Registered users only Download (1MB) | Request a copy |
Abstract
Pelaksanaan proyek konstruksi sering mengalami keterlambatan, salah satunya akibat perubahan desain. Hal ini terjadi pada proyek Rehabilitasi Total SDN 03 Balekambang, yang mengalami penambahan luasan bangunan sehingga menyebabkan jadwal pada item-item pekerjaan selanjutnya turut mengalami kemunduran. Berdasarkan latar belakang tersebut, penelitian ini bertujuan untuk menciptakan penjadwalan ulang proyek dengan mengimplementasikan BIM dengan integrasi pemodelan 3D dan penjadwalan proyek yang mencakup Pekerjaan Struktur, Pekerjaan Arsitektur, dan Pekerjaan MEP untuk menghasilkan jadwal yang lebih terstruktur. Metode yang digunakan dalam proses penelitian ini adalah pengembangan 4D. Tahap awal dalam penelitian ini dimulai dengan melakukan analisis untuk merancang proses pengembangan produk yang akan dibuat, kemudian dilanjutkan dengan pemilihan perangkat lunak yang digunakan untuk membuat penggabungan model 3D dan penjadwalan, yaitu Autodesk Navisworks. Penyusunan penggabungan model 3D dimulai dari pengumpulan data model 3D dari tiga disiplin (arsitektur, struktur, dan MEP), pembuatan jadwal proyek menggunakan Microsoft Project setelah progres 39,185%, hingga pengintegrasian model dengan data penjadwalan tersebut. Hasil penjadwalan awal menunjukkan durasi 140 hari, meningkat menjadi 410 hari setelah schedule adendum. Melalui simulasi BIM 4D, durasi dapat direduksi menjadi 365 hari. Hasil ini menunjukkan bahwa BIM 4D mampu memberikan efisiensi waktu yang signifikan pada sisa pelaksanaan proyek. Selain itu, penjadwalan ulang dengan pendekatan BIM 4D juga dapat mengurangi risiko keterlambatan lanjutan serta mempercepat jadwal prediksi penyelesaian proyek. ***** Construction projects often experience delays, one of which is caused by design changes. This occurred in the Total Rehabilitation Project of SDN 03 Balekambang, which underwent an expansion of the building area, causing delays in subsequent work items. Based on this background, this study aims to create a rescheduled project timeline by implementing BIM through the integration of 3D modeling and project scheduling, covering Structural Work, Architectural Work, and MEP Work to produce a more structured schedule. The method used in this study is the 4D development approach. The initial stage of the research began with an analysis to design the development process of the product, followed by the selection of software used to integrate the 3D model and schedule, namely Autodesk Navisworks. The compilation of the integrated 3D model began with the collection of 3D model data from the three disciplines (architecture, structure, and MEP), the creation of the project schedule using Microsoft Project after the progress reached 39.185%, and the integration of the model with the scheduling data. The initial schedule showed a duration of 140 days, which increased to 410 days after the schedule addendum. Through the 4D BIM simulation, the duration could be reduced to 365 days. These results show that 4D BIM is capable of providing significant time efficiency for the remaining project execution. In addition, rescheduling using the 4D BIM approach can also reduce the risk of further delays and accelerate the predicted project completion timeline.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Lenggogeni, M.T. ; 2). Rezi Berliana Yasinta, M.T. |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil Teknologi dan Ilmu Terapan > Konstruksi Bangunan |
Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
Depositing User: | Elvina Alodia Ramandhani . |
Date Deposited: | 11 Aug 2025 00:30 |
Last Modified: | 11 Aug 2025 00:30 |
URI: | http://repository.unj.ac.id/id/eprint/59245 |