JOHANNES PANJAITAN, . (2026) PERENCANAAN 'STRUKTUR ATAS' GEDUNG BETON BERTULANG 8 LANTAI DENGAN MENGGUNAKAN SISTEM GANDA (STUDI KASUS : RUMAH SAKIT UMUM DAERAH PESANGGRAHAN, JAKARTA SELATAN). Diploma thesis, UNIVERSITAS NEGERI JAKARTA.
|
Text
COVER.pdf Download (1MB) |
|
|
Text
BAB 1.pdf Download (555kB) |
|
|
Text
BAB 2.pdf Restricted to Registered users only Download (1MB) | Request a copy |
|
|
Text
BAB 3.pdf Restricted to Registered users only Download (1MB) | Request a copy |
|
|
Text
BAB 4.pdf Restricted to Registered users only Download (3MB) | Request a copy |
|
|
Text
BAB 5.pdf Restricted to Registered users only Download (402kB) | Request a copy |
|
|
Text
DAFTAR PUSTAKA.pdf Download (280kB) |
|
|
Text
LAMPIRAN.pdf Restricted to Registered users only Download (741kB) | Request a copy |
Abstract
Gedung baru RSUD Pesanggrahan Jakarta Selatan, pada awalnya direncanakan tanpa menggunakan shearwall, namun hasil kinerja struktur menunjukkan bahwa pada kriteria periode getar dan simpangan antar tingkat tidak memenuhi ketentuan dari SNI 1726:2019. Mengacu dari hal tersebut, maka dilakukan penambahan shearwall sebagai alternatif meningkatkan kekakuan struktur. Penelitian ini merancang RSUD Pesanggrahan 8 lantai menggunakan Sistem Ganda (gabungan SRPMK dan shearwall). Mutu beton untuk kolom dan shearwall menggunakan 〖f'〗_c=40 Mpa sedangkan balok, pelat, dan tangga menggunakan 〖f'〗_c=35 Mpa dan mutu baja BJTS 420B (f_y=420 Mpa). Software yang digunakan menganalisis struktur adalah ETABS dengan analisis 3 dimensi menggunakan metode response spectrum analysis (RSA). Peneliti merancang 4 shearwall dengan bentuk yang berbeda, yaitu (1) bentuk I, (2) bentuk I, (3) bentuk T, dan (4) bentuk L. Hasil rancangan menunjukkan bahwa penambahan shearwall dapat mereduksi periode getar struktur dari 2,1148 menjadi 0,9223 (56,4 %). Selain itu simpangan antar tingkat juga menjadi memenuhi batas izin. Rancangan struktur, diperoleh bahwa shearwall (1) menggunakan tulangan 2D19 – 100 dan shearwall (2), (3), dan (4) 2D19 – 200. Kolom 900 x 900 menggunakan tulangan longitudinal 40D29 dan tulangan transversal D13-100. Balok 400 x 800 dengan tulangan tumpuan 9D22 dan tulangan lapangan 6D22. Tebal pelat lantai 120 mm dengan tulangan D10-200. Tulangan kord D13-250 dan tulangan kolektor D13-100.***** The new building of the Pesanggrahan General Hospital in South Jakarta was initially planned without using shear walls, but the results of the structural performance analysis showed that the vibration period and inter-story drift criteria did not meet the requirements of SNI 1726:2019. Referring to this, shearwalls were added as an alternative to increase the structure's stiffness. This study designs an 8-story Pesanggrahan Regional General Hospital using a Dual System (a combination of SRPMK and shearwalls). The concrete strength for columns and shear walls is f'c = 40 MPa, while beams, slabs, and stairs use f'c = 35 MPa and steel grade BJTS 420B (fy = 420 MPa). The software used to analyze the structure is ETABS, with 3D analysis using the response spectrum analysis (RSA) method. Researchers designed 4 shearwalls with different shapes, namely (1) I-shape, (2) I-shape, (3) T-shape, and (4) L-shape. The design results show that adding shearwalls can reduce the structure's vibration period from 2.1148 to 0.9223 (56.4%). Additionally, the inter-level deviation also meets the permitted limit. Structure design, it was found that shearwall (1) uses 2D19 – 100 reinforcement and shearwalls (2), (3), and (4) use 2D19 – 200 reinforcement. A 900 x 900 column uses 40D29 longitudinal reinforcement and D13-100 transverse reinforcement. A 400 x 800 beam has 9D22 support reinforcement and 6D22 field reinforcement. Floor slab thickness 120 mm with D10-200 reinforcement. Chord reinforcement D13-250 and collector reinforcement D13-100.
| Item Type: | Thesis (Diploma) |
|---|---|
| Additional Information: | 1). Ir. Erna Septiandini, M.T. ; 2). Mirara Khanza, M.T. |
| Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil Teknologi dan Ilmu Terapan > Konstruksi Bangunan |
| Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
| Depositing User: | Users 32182 not found. |
| Date Deposited: | 30 Jan 2026 03:17 |
| Last Modified: | 30 Jan 2026 03:17 |
| URI: | http://repository.unj.ac.id/id/eprint/64390 |
Actions (login required)
![]() |
View Item |
