PERENCANAAN FABRIKASI LIFTER CONVEYOR DENGAN SCISSORS SYSTEM SEBAGAI ALAT TRANSFER CROSSMEMBER

ANGGIE OCTAVIAN L. GHUFRAN, . (2017) PERENCANAAN FABRIKASI LIFTER CONVEYOR DENGAN SCISSORS SYSTEM SEBAGAI ALAT TRANSFER CROSSMEMBER. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
1. Cover Skripsi.pdf

Download (120kB)
[img] Text
4. BAB II.pdf

Download (994kB)
[img] Text
2. Pengesahan & Daftar Isi.pdf

Download (1MB)
[img] Text
3. BAB I.pdf

Download (347kB)
[img] Text
8. Daftar Pustaka & Lampiran.pdf

Download (4MB)
[img] Text
9. Riwayat Hidup.pdf

Download (106kB)
[img] Text
7. BAB V.pdf

Download (174kB)
[img] Text
6. BAB IV.pdf

Download (1MB)
[img] Text
5. BAB III.pdf

Download (183kB)

Abstract

Pada penelitian ini bertujuan membuat perencanaan fabrikasi lifter conveyor dengan scissors system. Peneliti memfokuskan pada perencanaan fabrikasi lifter conveyor dengan scissors system sebagai alat transfer crossmember. Metode yang digunakan adalah metode kajian pustaka yaitu penulis melakukan studi literatur dari buku, jurnal dan sumber lain yang berhubungan dengan perencanaan fabrikasi lifter conveyor. Metode yang kedua yaitu metode eksperimen dengan cara pembacaan gambar, penentuan alat/mesin yang digunakan, menentukan perencanaan fabrikasi, dan pengujian mekanisme gerak lifter conveyor. Hasil yang dicapai pada penelitian ini yaitu perencanaan fabrikasi lifter conveyor menggunakan proses perencanaan pembuatan per-bagian. Bagian utama pada perencanaan fabrikasi ini yaitu scissors system, cylinder pneumatic, frame lifter conveyor bagian bawah, frame lifter conveyor bagian atas dan roller conveyor. Alat-alat yang digunakan dalam perencanaan fabrikasi lifter conveyor ini yaitu, mesin bubut, mesin frais, mesin gerinda potong, mesin bor saw, mesin las dengan jenis las yang digunakan adalah las SMAW (las busur listrik) dan elektroda yang digunakan adalah E6013. Kemudian untuk bahan (part) yang diperlukan dalam perencanaan fabrikasi lifter conveyor adalah : 1) besi kanal UNP, 2) besi hollow square, 3) besi hollow rectangular, 4) besi plat, 5) besi pipa, 6) besi siku, 7) poros, 8) bearing, 9) bushing, 10) ring, 11) snap ring, 12) mur dan baut. Perencanaan fabrikasi ini sangat perlu dilakukan sebelum memasuki tahap pembuatan alat yang sebenarnya. Hal tersebut dilakukan agar tidak ada kesalahan dalam proses pembuatan alat lifter conveyor dengan scissors system. In this study aims to make planning the fabrication of conveyor lifter with scissors system. Researchers focused on fabrication planning lifter with scissors conveyor system as a means of transfer crossmember.The method used is the method of literature review from the literature that authors of books, journals and other sources related to the design fabrication Lifter conveyor. The second method is the experimental method by means of reading the image, the determination of equipment / machinery used, determine the planning of fabrication, and testing of conveyor lifter motion mechanism. The results achieved in this research is planning the fabrication of conveyor lifters use planning process of making per-part. The main part in the planning of this fabrication, namely scissors system, pneumatic cylinder, the bottom of the conveyor frame lifter, lifter frame upper conveyor and roller conveyor. The tools used in planning the fabrication of this conveyor lifter namely, lathes, milling machines, grinding machines cutting, drilling machine saw, welding machines to weld types used were SMAW (electric arc welding) and the electrode used is E6013. Then for materials (part) that is needed in the planning of fabrication Lifter conveyor are: 1) the canal iron UNP, 2) hollow steel square, 3) hollow steel rectangular, 4) iron plate, 5) iron pipe, 6) brackets, 7) shaft, 8) bearing, 9) bushing, 10) ring, 11) snap ring, 12) nuts and bolts. Planning fabrication is very necessary before entering the manufacturing phase of the actual tool. This is done so that there are no errors in the manufacturing process tool with scissors lifter conveyor system.

Item Type: Thesis (Sarjana)
Additional Information: 1) Drs. H. Sirojuddin, M.T 2) Himawan Hadi Sutrisno, S.T., M.T
Subjects: Teknologi dan Ilmu Terapan > Teknik Mesin, Mekanika Teknik
Divisions: FT > S1 Pendidikan Teknik Mesin
Depositing User: sawung yudo
Date Deposited: 01 Jul 2022 01:54
Last Modified: 01 Jul 2022 01:54
URI: http://repository.unj.ac.id/id/eprint/31294

Actions (login required)

View Item View Item