AHMAD MAULANA, . (2025) ANALISIS FAKTOR PENGHAMBAT PROSES PEMBONGKARAN BATU BARA PADA SALAH SATU BADAN USAHA PELABUHAN DI JAKARTA. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
![]() |
Text
File Cover.pdf Download (1MB) |
![]() |
Text
Bab 1 Pendahuluan.pdf Download (471kB) |
![]() |
Text
Bab 2 Landasan Teori.pdf Restricted to Registered users only Download (624kB) |
![]() |
Text
Bab 3 Metodologi.pdf Restricted to Registered users only Download (497kB) |
![]() |
Text
Bab 4 Hasil dan Pembahasan.pdf Restricted to Registered users only Download (873kB) |
![]() |
Text
Bab 5 Kesimpulan dan Saran.pdf Restricted to Registered users only Download (332kB) |
![]() |
Text
Daftar Pustaka.pdf Download (332kB) |
![]() |
Text
Lampiran.pdf Restricted to Registered users only Download (1MB) |
Abstract
Penelitian ini bertujuan untuk mengetahui faktor yang menjadi penghambat dalam proses pembongkaran batu bara pada salah satu Badan Usaha Pelabuhan yang ada di Jakarta. Dengan menggunakan pendekatan kuantitatif deskriptif, informasi diperoleh melalui observasi, wawancara menggunakan skala likert, dan pengumpulan dokumen dari Tujuh responden yang terlibat langsung dalam kegiatan pembongkaran batu bara di lapangan. Data dari wawancara dengan skala likert dianalisis menggunakan statistik deskriptif dan disajikan dalam bentuk diagram fishbone. Hasil penelitian mengungkapkan bahwa hambatan Faktor Lingkungan merupakan penyebab utama faktor penghambat dalam proses pembongkaran batu bara dengan nilai rata-rata 3,32, yang mencakup masalah Kondisi cuaca (hujan lebat, angin kencang dan gelombang tinggi), terjadinya kemacetan, armada kesulitan manuver dan terbatasnya kapasitas area tunggu truk. Selain itu, faktor Alat memberikan kontribusi penyebab penghambat seperti, terjadinya ganguan alat (kerusakan pada mesin dan kehabisan bahan bakar), Kinerja dan jumlah alat tidak sesuai dengan volume batu bara yang ditangani dan kurangnya rotasi armada truk dengan nilai rata-rata 3,15. Temuan ini menegaskan bahwa kinerja operasional pelabuhan, yang tercermin dari nilai ET/BT dan T/G/H yang fluktuatif dan sering di bawah standar, sangat dipengaruhi oleh faktor tersebut seperti Faktor Lingkungan, Faktor Alat, Faktor Material, Faktor Manusia dan Faktor Prosedur. Dampak dari faktor-faktor dominan ini secara langsung terlihat pada meningkatnya waktu kapal di dermaga dan produktivitas pembongkaran batu bara, yang mengharuskan manajemen untuk memprioritaskan perbaikan pada aspek-aspek tersebut guna mencapai standar kinerja yang lebih optimal. Kata Kunci: Kinerja, Faktor Penghambat, Pembongkaran ***** This research aims to determine the inhibiting factors in the coal unloading process at one of the Port Business Entities in Jakarta. By using a descriptive quantitative approach, information was obtained through observation, interviews using a Likert scale, and document collection from seven respondents who were directly involved in coal unloading activities in the field. Data from interviews with a Likert scale were analyzed using descriptive statistics and presented in the form of a fishbone diagram. The results of the study revealed that Environmental Factors were the main cause of inhibiting factors in the coal unloading process with an average value of 3.32, which included problems with weather conditions (heavy rain, strong winds and high waves), congestion, fleets having difficulty maneuvering and limited capacity of the truck waiting area. In addition, Equipment factors contributed to the causes of inhibitions such as, the occurrence of equipment interference (damage to the engine and running out of fuel), Performance and number of equipment not in accordance with the volume of coal handled and Lack of rotation of the truck fleet with an average value of 3.15. These findings confirm that port operational performance, as reflected in fluctuating and often below standard ET/BT and T/G/H values, is greatly influenced by factors such as Environmental Factors, Equipment Factors, Material Factors, Human Factors and Procedure Factors. The impact of these dominant factors is directly visible in the increase in ship time at dock and coal unloading productivity, which requires management to prioritize improvements in these aspects to achieve more optimal performance standards. Keywords: Performance, Inhibiting Factors, Dismantling
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Kencana Verawati, S.S.T., M.M.Tr. ; 2). Drs. Dadang Suyadi Suryasumirat, M.S. |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Hidraulik, Pelabuhan, Irigasi |
Divisions: | FT > D IV Manajemen Pelabuhan dan Logistik Maritim |
Depositing User: | Ahmad Maulana . |
Date Deposited: | 08 Aug 2025 07:53 |
Last Modified: | 08 Aug 2025 07:53 |
URI: | http://repository.unj.ac.id/id/eprint/59125 |
Actions (login required)
![]() |
View Item |