IDENTIFIKASI FAKTOR INTERNAL KETERLAMBATAN GUDANG PENYIMPANAN SEMENTARA DALAM PROYEK PEMBANGUNAN GEDUNG BARU UNIVERSITAS NEGERI JAKARTA

DHIYANANDA HANIIFAH PUTRI, . (2025) IDENTIFIKASI FAKTOR INTERNAL KETERLAMBATAN GUDANG PENYIMPANAN SEMENTARA DALAM PROYEK PEMBANGUNAN GEDUNG BARU UNIVERSITAS NEGERI JAKARTA. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (1MB)
[img] Text
BAB I.pdf

Download (249kB)
[img] Text
BAB II.pdf
Restricted to Registered users only

Download (330kB) | Request a copy
[img] Text
BAB III.pdf
Restricted to Registered users only

Download (294kB) | Request a copy
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (458kB) | Request a copy
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (243kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (250kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

Keterlambatan kesiapan gudang penyimpanan sementara dalam proyek pengadaan furnitur Universitas Negeri Jakarta tahun 2024 berdampak pada tertundanya proses distribusi barang dan meningkatnya biaya sewa gudang tambahan. Studi ini bertujuan mengidentifikasi faktor-faktor internal yang menyebabkan keterlambatan tersebut dengan pendekatan deskriptif melalui wawancara dan observasi. Hasil menunjukkan bahwa faktor sarana dan prasarana menjadi penyebab utama, di mana gudang sementara tidak memenuhi standar teknis penyimpanan. Perencanaan waktu pelaksanaan juga tidak berjalan sesuai jadwal akibat keterlambatan pencairan anggaran, yang turut menjadi faktor pembiayaan paling krusial. Prosedur dan metode kerja belum terdokumentasi secara formal; tidak tersedia SOP atau panduan teknis pengelolaan gudang. Koordinasi antar pihak berlangsung cukup baik secara informal, namun tanpa rencana kontinjensi saat gudang belum siap. Sebaliknya, faktor sumber daya manusia dinilai tidak menjadi penyebab, karena seluruh tim telah menjalankan tugasnya secara optimal. Kesimpulannya, keterlambatan kesiapan gudang dipengaruhi oleh kombinasi faktor teknis, perencanaan, dan finansial, sehingga diperlukan sistem pengelolaan proyek yang lebih terstruktur dan responsif terhadap risiko keterlambatan.***** The delay in the readiness of the temporary storage warehouse for the 2024 Jakarta State University furniture procurement project resulted in delayed distribution of goods and increased additional warehouse rental costs. This study aimed to identify internal factors contributing to these delays using a descriptive approach through interviews and observations. The results indicate that facilities and infrastructure were the primary cause, with the temporary warehouse not meeting technical storage standards. Implementation planning also fell short of schedule due to delays in budget disbursement, which was also a crucial financing factor. Work procedures and methods were not formally documented; there were no SOPs or technical guidelines for warehouse management. Coordination between parties was quite good informally, but without a contingency plan for when the warehouse was not ready. Conversely, human resources were not considered a contributing factor, as the entire team performed their duties optimally. In conclusion, the delay in warehouse readiness was influenced by a combination of technical, planning, and financial factors, necessitating a more structured and responsive project management system to address the risk of delays.

Item Type: Thesis (Sarjana)
Additional Information: 1). Winoto Hadi, S.T., M.T. ; 2). Intan Puspa Wangi, S.T., M.T.
Subjects: Manajemen > Manajemen Kantor, Organisasi
Manajemen > Manajemen Sumber Daya Manusia
Divisions: FT > D IV Manajemen Pelabuhan dan Logistik Maritim
Depositing User: Dhiyananda Haniifah Putri .
Date Deposited: 11 Aug 2025 02:11
Last Modified: 11 Aug 2025 02:11
URI: http://repository.unj.ac.id/id/eprint/59438