PENGARUH CAPASITOR BANK TERHADAP KESTABILAN FAKTOR DAYA DI PLT BIOMASSA BANTAR GEBANG

BUDI NUGROHO, . (2015) PENGARUH CAPASITOR BANK TERHADAP KESTABILAN FAKTOR DAYA DI PLT BIOMASSA BANTAR GEBANG. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
BAB III.pdf
Restricted to Registered users only

Download (196kB)
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (403kB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (143kB)
[img] Text
BAB I.pdf

Download (241kB)
[img] Text
BAB II.pdf
Restricted to Registered users only

Download (1MB)
[img] Text
LAMPIRAN BELAKANG.pdf

Download (1MB)
[img] Text
LAMPIRAN DEPAN.pdf

Download (247kB)
[img] Text
Biografi Budi.pdf
Restricted to Registered users only

Download (154kB)
[img] Text
2015-07-29_223214.pdf

Download (199kB)

Abstract

Tujuan penelitian dilakukan untuk mengetahui seberapa besar pengaruh Capasitor Bank terhadap kestabilan faktor daya di PLT Biomassa Bantar Gebang. Penelitian dilakukan di PLT Biomassa Bantar Gebang selama 3 bulan mulai tanggal 1 April sampai tanggal 30 Juni 2015, Berlokasi di Jalan Raya Narogong KM 15 Pangkalan 5 Bantar Gebang, Kota Bekasi. Metode yang digunakan untuk meneliti kestabilan faktor daya ini yaitu menggunakan metode eksperimen lapangan. Penelitian yang dilakukan diawali dengan mengukur nilai cos phi dilihat dari pada siang dan malam hari atau pada saat beban normal dan beban puncak, kemudian memperhitungkan kapasitas daya pemakaian penuh yang ada pada perusahaan. Setelah itu melakukan analisis teknis perhitungan jumlah daya, lalu melakukan analisa efisiensi faktor daya dan biaya pemakaian operasional listrik terhadap pemasangan capasitor bank di PLTB Bantar Gebang Kota Bekasi. Hasil penelitian di PLT Biomassa Bantar Gebang menunjukan bahwa pemakaian daya aktif listrik per bulan dengan faktor daya 0,83 sebesar 205.920 kW. Pemakaian daya reaktif tanpa Capasitor Bank dengan faktor daya 0,83 sebesar 49.421 kVAR sehingga menyebabkan kerugian sebesar Rp 55.134.067/bulan. Dengan stabilnya factor daya sebesar 0,97, maka nilai kapasitansi Capacitor Bank sebesar 1265 x 10-3 Farrad. Hasil penelitian panel LVMDB Auxiliary menggunakan capacitor bank dengan kelebihan pemakaianan daya reaktif tanpa kompensasi PLN = Daya reaktif tanpa kompensasi – Batas Daya Reaktif dengan batas PLN = 51.480 kVAR - 127.670 kVAR = -76.190 kVAR (negatif), maka perusahaan tidak dikenakan biaya pemakaian beban kVARh. Hasil penelitian di PLTB Bantar Gebang menunjukan bahwa panel LVMDP Auxiliary dengan menggunakan capacitor bank, Perusahaan bisa menghemat biaya selama 1 bulan sebesar Rp 55.134.067. Sehingga kesimpulan dari penelitian ini adalah penggunaan Panel Capacitor Bank sangat penting untuk meningkatkan factor daya listrik yang menurun akibat beban induktif dan menghindari kerugian daya reaktif yang di akibatkan turunnya factor daya *The aim of research is done to determine how much influence the stability of the capacitor bank in PLT Biomass power factor Bantar Gebang.. The study was conducted in PLT Biomass Bantargebang for 3 months from April 1 until June 30, 2015, located at Jalan Raya Narogong KM 15 base 5 Bantargebang, Bekasi. The method used to examine the stability of the power factor is that using field experiments. Research carried begins with measuring the value of cos phi views of the day and night or during normal load and peak load, and then use the full power capacity into account that exist in the company. After that, perform technical analysis of the calculation of the amount of power, then to analyze the efficiency of the power factor and the operational cost of electricity to the installation of capacitor banks in PLTB Bantargebang Bekasi. The study results Biomass Bantargebang PLT shows that the active power consumption of electricity per month with a power factor of 0.83 at 205 920 kW. The use of reactive power without capacitor bank with a power factor of 0.83 at 49 421 KVAR, causing losses amounting to Rp 55,134,067 / month. With a stable power factor of 0.97, then the value of capacitance Capacitor Bank at 1265 x 10-3 Farrad. Auxiliary LVMDB panel research results using capacitor banks with excess reactive power without compensation pemakaianan PLN = reactive power without compensation - Reactive Power Limit to limit PLN = 51480 KVAR - 127670 KVAR = -76190 KVAR (negative), then the company does not charge a load usage kVArh , The research results show that the thermal power station Bantargebang LVMDP panel Auxiliary by using the capacitor bank, the Company can cut costs during the first month of Rp 55,134,067. So the conclusions of this study is the use of Capacitor Bank Panel is very important to improve the power factor is decreased due to inductive load and avoid the reactive power losses in result of the decline in power factor.

Item Type: Thesis (Sarjana)
Additional Information: 1). Dr. Suyitno, M.Pd ; 2). Drs. Readysal Monantun
Subjects: Teknologi dan Ilmu Terapan > Teknik Energi > Energi Listrik
Divisions: FT > S1 Pendidikan Teknik Elektro
Depositing User: Users 8922 not found.
Date Deposited: 21 Apr 2022 05:40
Last Modified: 21 Apr 2022 05:40
URI: http://repository.unj.ac.id/id/eprint/27000

Actions (login required)

View Item View Item