ANUGRAH TAUFIQ NURUL RAMADHAN, . (2017) ANALISA KAPASITAS SUNGAI BEKASI PADA PERUMAHAN PONDOK GEDE PERMAI. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
4KATA PENGANTAR.pdf Download (112kB) |
|
Text
2HALAMAN PENGESAHAN.pdf Download (85kB) |
|
Text
3HALAMAN PERNYATAAN.pdf Download (84kB) |
|
Text
8DAFTAR TABEL.pdf Download (177kB) |
|
Text
7DAFTAR ISI.pdf Download (383kB) |
|
Text
6ABSTRACT.pdf Download (187kB) |
|
Text
5ABSTRAK.pdf Download (262kB) |
|
Text
11BAB I-5.pdf Download (847kB) |
|
Text
9DAFTAR GAMBAR.pdf Download (179kB) |
|
Text
12DAFTAR PUSTAKA.pdf Download (192kB) |
|
Text
10DAFTAR LAMPIRAN.pdf Download (292kB) |
|
Text
13Lampiran.pdf Download (2MB) |
|
Text
14RIWAYAT HIDUP.pdf Download (108kB) |
|
Text
1cover.pdf Download (105kB) |
Abstract
The Purposes of this research are to get the result of flood debit calculation with return periods of 2 years, 5 years,10 years, and 25 years and also to know the patch capacity of Bekasi river with a return period of 25 years. This research used the maximum monthly rainfall data of Ciriung rainfall station, Klapa Nunggal rainfall station, and Halim Perdana Kusuma rainfall station which obtained from the BMKG. Whereas for the proponent technical data planning are obtained from Binamarga official of Bekasi city. The planning methods used in this research are literature and field observation. This research used the chosen distribution frequency method og Log Person III, obtained a value of precipitation plan amounting to 890,15 mm. then after doing the calculations of rainfall intensity using method of Mononobe, hourly rainfall data were obtained, and then after doing the approximate calculation of peak flow rate using HSS Nakayasu, the peak flow rate result for the period of 25 years is 2109,45 m3 /sec. after calculating the capacity of the Bekasi river, located in Pondok Gede Permai regency, acquired the capacity that can be accommodated in the amount of 960,74 m3 /sec. This result of this research shows that the Bekasi river capacity in Pondok Gede Permai regency can not accommodate the water discharge for 25 years which would result in overflowing in the river and flooding in Pondok Gede Permai regency Because as calculations Qs < Qr then made the capacity calculation with adding high embankment of 2 feet so getting the result Qs = 2242,85 then can accommodate the flood plan period 25 years.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1) Drs. Arris Maulana, MT 2) Dr.Ir Mochamad Amron, MSc |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil |
Divisions: | FT > S1 Pendidikan Teknik Bangunan |
Depositing User: | sawung yudo |
Date Deposited: | 30 Jun 2022 09:18 |
Last Modified: | 30 Jun 2022 09:18 |
URI: | http://repository.unj.ac.id/id/eprint/31220 |
Actions (login required)
View Item |