MOCHAMAD ALDI WIJAYA, . (2024) IMPLEMENTASI BUILDING INFORMATION MODELING 4D PADA PENJADWALAN PEMBANGUNAN GEDUNG X DI JAKARTA. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
COVER-DAFTAR ISI.pdf Download (662kB) |
|
Text
BAB 1.pdf Download (377kB) |
|
Text
BAB 2.pdf Restricted to Registered users only Download (557kB) | Request a copy |
|
Text
BAB 3.pdf Restricted to Registered users only Download (636kB) | Request a copy |
|
Text
BAB 4.pdf Restricted to Registered users only Download (3MB) | Request a copy |
|
Text
BAB 5.pdf Restricted to Registered users only Download (359kB) | Request a copy |
|
Text
DAFTAR PUSTAKA.pdf Download (365kB) |
|
Text
LAMPIRAN.pdf Restricted to Registered users only Download (2MB) | Request a copy |
Abstract
ABSTRAK. Pada saat ini terdapat beberapa pembangunan infrastruktur di Indonesia yang sudah menerapkan BIM. Akan tetapi, Sumber Daya Manusia (SDM) pada pekerjaan konstruksi terutama di kalangan engineering masih kurang memahami cara penggunaan Building Information Modeling (BIM) sehingga tidak terlatih untuk menggunakan teknologi digital pada proses penjadwalan pembangunan konstruksi. Termasuk Pada Proyek Pembangunan Gedung X di Jakarta belum menerapkan BIM dalam perencanaan penjadwalan. Maka dari itu, pengimplementasian Building Information Modeling 4D direkomendasikan dalam penerapan perencanaan penjadwalan pada Pembangunan Gedung X. Tujuan penelitian ini adalah untuk mengetahui penerapan perencanaan penjadwalan dengan permodelan 4D menggunakan program aplikasi terintegrasi BIM yaitu autodesk naviswork dan microsoft project. Metode yang digunakan dalam penelitian ini berupa metode Research and Development dengan konsep 4D (Define, Design, Development, Disseminate). Hasil yang didapatkan dari penjadwalan berupa durasi penyelesaian pembangunan gedung X yaitu 254 hari dan tampilan visualisasi model 3D proses pembangunan. ***** ABSTRACT. At present there are several infrastructure developments in Indonesia that have implemented BIM. However, Human Resources (HR) in construction work, especially in engineering, still lack understanding of how to use Building Information Modeling (BIM) so that they are not trained to use digital technology in the construction scheduling process. Including the X Building Construction Project in Jakarta has not implemented BIM in scheduling planning. Therefore, the implementation of 4D Building Information Modeling is recommended in the application of scheduling planning in Building X Construction. The purpose of this study is to determine the application of scheduling planning with 4D modeling using BIM integrated application programs, namely autodesk naviswork and microsoft project. The method used in this research is the Research and Development method with the 4D concept (Define, Design, Development, Disseminate). The results obtained from scheduling in the form of a duration of completion of the construction of building X, which is 254 days and a visualization display of the 3D model of the construction process.
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Adhi Purnomo, M.T ; 2). Rezi Berliana Yasinta, M.T |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil |
Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
Depositing User: | Mochamad Aldi Wijaya . |
Date Deposited: | 07 Aug 2024 23:44 |
Last Modified: | 07 Aug 2024 23:44 |
URI: | http://repository.unj.ac.id/id/eprint/49289 |
Actions (login required)
View Item |