PEMODELAN BIM 3D DAN PERHITUNGAN ULANG RAB ARSITEKTUR DAN MEP AKIBAT ADANYA CHANGE ORDER PADA PROYEK KAI LIVING GONDANGDIA

ODELIA SALMA RHENANTY, . (2025) PEMODELAN BIM 3D DAN PERHITUNGAN ULANG RAB ARSITEKTUR DAN MEP AKIBAT ADANYA CHANGE ORDER PADA PROYEK KAI LIVING GONDANGDIA. Diploma thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (909kB)
[img] Text
BAB 1.pdf

Download (278kB)
[img] Text
BAB 2.pdf
Restricted to Registered users only

Download (342kB) | Request a copy
[img] Text
BAB 3.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text
BAB 4_compressed.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[img] Text
BAB 5.pdf
Restricted to Registered users only

Download (65kB) | Request a copy
[img] Text
DAFTAR PUSTAKA.pdf

Download (185kB)
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (2MB) | Request a copy

Abstract

Proyek KAI Living Gondangdia mengalami change order atau perubahan perintah kerja yang berdampak langsung terhadap volume pekerjaan dan Rencana Anggaran Biaya (RAB), khususnya pada elemen arsitektur dan MEP. Permasalahan ini timbul akibat belum diterapkannya Building Information Modeling (BIM), sehingga proses perancangan dan perhitungan biaya masih dilakukan secara konvensional. Penelitian ini bertujuan untuk menerapkan BIM sebagai solusi dalam pemodelan ulang elemen arsitektur dan MEP, serta melakukan perhitungan ulang RAB berdasarkan volume yang dihasilkan dari pemodelan 3D. Metode yang digunakan adalah Research and Development (R&D) dengan model pengembangan 4D yang terdiri dari tahapan Define, Design, Develop, dan Disseminate. Berdasarkan hasil perhitungan RAB pekerjaan arsitektur dan MEP diperoleh sebesar Rp10.385.607.422,95. Hasil penelitian ini diharapkan dapat meningkatkan akurasi perhitungan volume dan efisiensi perencanaan anggaran biaya, serta memberikan gambaran nyata mengenai efektivitas penerapan BIM sebagai alat pendukung pengambilan keputusan dalam proyek konstruksi, khususnya dalam mengatasi permasalahan change order. Produk ini selanjutnya akan disebarluaskan menggunakan Autodesk Viewer. **** KAI Living Gondangdia project has experienced several change orders or work instruction modifications that directly impact the work volume and Cost Estimation, particularly in the architectural and MEP elements. These issues arise due to the absence of Building Information Modeling (BIM), resulting in design and cost planning processes still being carried out conventionally. This study aims to implement BIM as a solution for remodeling architectural and MEP elements, as well as to recalculate the cost estimation based on volume data generated from the 3D model. The research method used is Research and Development (R&D) with a 4D development model consisting of the stages: Define, Design, Develop, and Disseminate. Based on the recalculated cost estimate, the total value for architectural and MEP work amounts to Rp10.385.607.422,95. The results of this research are expected to improve the accuracy of volume calculation and cost planning efficiency, while also providing a clear overview of BIM’s effectiveness as a decision-support tool in construction projects, particularly in addressing change order issues.

Item Type: Thesis (Diploma)
Additional Information: 1). Lenggogeni, M.T. ; 2). Muh. Abdhy Gazali H.S., M.T.
Subjects: Teknologi dan Ilmu Terapan > Teknik Sipil
Teknologi dan Ilmu Terapan > Konstruksi Bangunan
Divisions: FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung
Depositing User: Odelia Salma Rhenanty .
Date Deposited: 08 Aug 2025 03:13
Last Modified: 08 Aug 2025 03:13
URI: http://repository.unj.ac.id/id/eprint/59007

Actions (login required)

View Item View Item