PENGAMATAN STRUKTUR KOLOM PROYEK MENARA BRI GATOT SUBROTO TAHAP 2 JALAN JENDERAL GATOT SUBROTO KAV. 64 JAKARTA SELATAN TAHUN AKADEMIK 2019/2020 JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK

DHIMAS RAMADHANI, . (2020) PENGAMATAN STRUKTUR KOLOM PROYEK MENARA BRI GATOT SUBROTO TAHAP 2 JALAN JENDERAL GATOT SUBROTO KAV. 64 JAKARTA SELATAN TAHUN AKADEMIK 2019/2020 JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK. Diploma thesis, UNIVERSITAS NEGERI JAKARTA.

[img] Text
COVER.pdf

Download (583kB)
[img] Text
BAB 1.pdf

Download (249kB)
[img] Text
BAB 2.pdf

Download (507kB)
[img] Text
BAB 3.pdf

Download (429kB)
[img] Text
BAB 4.pdf

Download (2MB)
[img] Text
BAB 5.pdf

Download (125kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (122kB)
[img] Text
LAMPIRAN.pdf

Download (31MB)

Abstract

Dalam hal ini pekerjaan yang akan diamati adalah pekerjaan struktur kolom lantai 5 yang meliputi metode kerja, kebutuhan material, dan produktivitas tenaga kerja pada pekerjaan struktur kolom dengan pengamatan secara langsung di lapangan. Tujuan pengamatan ini adalah: 1.) Membuat dan mendeskripsikan secara detail metode kerja pekerjaan struktur kolom. 2). Menghitung besarnya nilai koefisien kebutuhan material pekerjaan struktur kolom. 3). Menghitung besarnya nilai koefisien tenaga kerja pada pekerjaan struktur kolom berdasarkan hasil pengamatan. Metode yang digunakan selama penyusunan Tugas Akhir ini adalah metode studi kasus lapangan dengan mengumpulkan data primer dan data sekunder. Kemudian, kedua data tersebut disatukan dan diharapkan dapat menghasilkan metode kerja pelaksanaan lapangan, nilai koefisien material, dan nilai koefisien tenaga kerja pada pekerjaan struktur kolom. Pada pengamatan di lapangan, pekerjaan struktur kolom dibagi menjadi 5 tahap pekerjaan, yaitu : 1) Pekerjaan Persiapan; 2) Pekerjaan Pembesian; 3) Pekerjaan Bekisting; 4) Pekerjaan Pengecoran; 5) Pembongkaran Bekisting Kolom. Perhitungan indeks material didapat dengan proses pengamatan dan wawancara di lapangan. Hasil data diolah dengan membagi volume rencana pekerjaan dengan volume pengamatan di lapangan. Koefisien yang di dapat dibandingkan dengan koefisien dari Peraturan Menteri Pekerjaan Umum No. 11/PRT/M/2013. Produktivitas tenaga kerja ditampilkan dalam koefisien tenaga kerja yang didapat dari pengamatan di lapangan. Data diolah dengan perhitungan jumlah waktu kerja di lapangan dibagi dengan volume pekerjaan yang hasilnya dikalikan dengan jam kerja untuk 1 hari. Hasilnya, kemudian dikalikan dengan jumlah tenaga kerja yang terlibat. Kata kunci : metode kerja, kebutuhan material, produktivitas tenaga kerja Prima Nandita Juhara Paradise, Dionadya Pratisto, Dhimas Ramadhani. Observation of Column Structure in BRI Tower Gatot Subroto Project, Final Task. Jakarta, D3 Civil Engineering Study Program, Faculty of Engineering, State University of Jakarta, 2019. Academic Advisor: Lenggogeni, M.T. In this study, we observed the activities of column structure on the 5th floor which specified in the following cases such as work method, material needs, and labor productivity with direct observation on-site. The objectives of this research include: 1.) To make and describe the work method of column structure thoroughly. 2.) To calculate the coefficient value for needed materials of column structure. 3.) To calculate the coefficient value for labors of column structure. The method used during the process while completing this study is called field study method that collects primary and secondary sources of data. Later, both data will be combined and expected to result fieldwork method, materials coefficient value, and labors coefficient value on the implementation of column structure. Throughout the research on-site, column structure construction is classified into 5 stages of work, for instance : 1) Initiation Work; 2) Rebars Work; 3) Formwork Work; 4) Column casting Work; 5) De-shuttering of column formwork Work. The calculation of materials coefficient is obtained by direct observation and doing intereviews on-site. The result of the data is processed by dividing planned quantity measurement with quantity measurement from observing on-site. Thus, the coefficient can be compared with the coefficient from Ministry of Public Works and Public Housing Regulation No. 11/PRT/M/2013. Labor productivity is resulted in labors coefficient obtained by observing on-site. The data is processed by calculating the amount of man hour on-site divided by quantity measurement that later the result is multiplied by man hour for one day. Then the result will be multiplied by the amount of the labors who involved. Keywords : work method, material needs, labor productivity

Item Type: Thesis (Diploma)
Additional Information: 1). Lenggogeni, M.T.
Subjects: Teknologi dan Ilmu Terapan > Teknik Sipil
Divisions: FT > D III Teknik Sipil
Depositing User: Users 1012 not found.
Date Deposited: 27 Mar 2020 11:48
Last Modified: 27 Mar 2020 11:48
URI: http://repository.unj.ac.id/id/eprint/4089

Actions (login required)

View Item View Item