NUR ACHMAD SYA'BANI, . (2024) PENYUSUNAN STANDAR OPERASIONAL PROSEDUR SISTEM MANAJEMEN KESELAMATAN KESEHATAN KERJA (SMK3) PEKERJAAN BORE PILE PADA PROYEK OFFICE 46 PROKLAMASI JAKARTA PUSAT. Sarjana thesis, UNIVERSITAS NEGERI JAKARTA.
Text
Cover.pdf Download (383kB) |
|
Text
BAB 1.pdf Download (178kB) |
|
Text
BAB 2.pdf Restricted to Registered users only Download (148kB) | Request a copy |
|
Text
BAB 3.pdf Restricted to Registered users only Download (252kB) | Request a copy |
|
Text
BAB 4.pdf Restricted to Registered users only Download (367kB) | Request a copy |
|
Text
BAB 5.pdf Restricted to Registered users only Download (57kB) | Request a copy |
|
Text
DAFTAR PUSTAKA.pdf Download (126kB) |
|
Text
LAMPIRAN..pdf Restricted to Registered users only Download (1MB) | Request a copy |
Abstract
Nur Achmad Sya’bani, Irika Widiasanti, Lenggogeni (2024). “Penyusunan Standar Operasional Prosedur Sistem Manajemen Keselamatan Kesehatan Kerja (SMK3) Pekerjaan Bore Pile pada Proyek Office 46 Proklamasi Jakarta Pusat” Skripsi. Jakarta: Program Studi Teknologi Rekayasa Konstruksi Bangunan Gedung Fakultas Teknik, Universitas Negeri Jakarta. Kecelakaan kerja pada putusnya tali baja pada saat melakukan pekerjaan bore pile merupakan hal yang sangat membahayakan. Untuk meminimalisir kecelakaan kerja pemerintah melalui Peraturan Menteri Peraturan Menteri Pekerjaan Umum Nomor : 05/PRT/M/2014 yang mengatur tentang Pedoman Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMK3) Konstruksi Bidang Pekerjaan Umum) dan mengatur tentang prosedur pada K3 untuk setiap pekerja/perusahaan. Penelitian ini bertujuan untuk meminimalisir adanya kesalahan prosedur Keselamatan Kesehatan dan Kerja (K3) pada pekerjaan fondasi bore pile pada pekerjaan proyek Pembangunan Office 46 Proklamasi Jakarta Pusat. Standar Operasional Prosedur (SOP) merupakan dokumen yang menjabarkan aktivitas operasional yang dilakukan sehari-hari, dengan tujuan agar pekerjaan tersebut dilakukan secara benar, tepat dan konsisten, untuk menghasilkan produk sesuai standar yang telah ditetapkan sebelumnya .Metode penelitian dan pengembangan produk yang digunakan yaitu, menggunakan metode 4D (Define, Design, Develop, Disseminate) yang akan membantu dalam metode penelitian dengan menggunakan kuesioner atau masukan yang terdapat pada hal tersebut dan berguna untuk penyusunan SOP. Pada saat penyusunan SOP memerlukan JSA, WBS, Metode kerja, Format SMK3 2021 PUPR, dan peraturan terkait dengan APD. Penelitian ini menghasilkan produk berupa SOP SMK3 Pekerjaan Bore Pile yang telah dilakukan uji validasi terhadap produk oleh validator dan dinyatakan layak. Kata kunci: Keselamatan Kesehatan dan Kerja, SMK3, Standar Operasional Prosedur ********** Accidents caused by the breaking of steel cables during bore pile work are extremely hazardous. To minimize work accidents, the government, through the Ministry of Public Works Regulation Number: 05/PRT/M/2014, which regulates the Guidelines for the Occupational Health and Safety Management System (SMK3) in Public Works Construction, has established procedures for K3 (Occupational Health and Safety) for every worker/company. This study aims to minimize procedural errors in Occupational Health and Safety (K3) during bore pile foundation work on the Office 46 Proklamasi Project in Central Jakarta. Standard Operating Procedures (SOP) are documents that detail daily operational activities, with the objective of ensuring that work is performed correctly, accurately, and consistently to produce products that meet pre-established standards. The research and product development method used is the 4D method (Define, Design, Develop, Disseminate), which aids in the research method by using questionnaires or feedback and is useful for SOP preparation. The preparation of the SOP requires JSA (Job Safety Analysis), WBS (Work Breakdown Structure), Work Methods, SMK3 2021 PUPR Format, and regulations related to PPE (Personal Protective Equipment). This research produces a product in the form of SOP SMK3 for Bore Pile Work, which has been validated by validators and deemed feasible. Keywords: Health and Occupational Safety, SMK3, Standard Operating Procedures
Item Type: | Thesis (Sarjana) |
---|---|
Additional Information: | 1). Dr.Ir. Irika Widiasanti, M.T. ; 2). Lenggogeni, M.T. |
Subjects: | Teknologi dan Ilmu Terapan > Teknik Sipil |
Divisions: | FT > D IV Teknologi Rekayasa Konstruksi Bangunan Gedung |
Depositing User: | Users 25094 not found. |
Date Deposited: | 07 Aug 2024 05:51 |
Last Modified: | 07 Aug 2024 05:51 |
URI: | http://repository.unj.ac.id/id/eprint/49009 |
Actions (login required)
View Item |